General Equipment at St. Louis Public Schools St. Louis Missouri

The equipment below represents the systems and infrastructure documented or typically present at this facility during the era when asbestos-containing materials were specified in industrial construction. This is general facility-equipment reference — not a legal attribution of any specific product, manufacturer, or exposure event to this facility. Material-category and manufacturer information is addressed in the AsbestosIndex Product Crosswalk linked under the records table below.

Documented Asbestos Evidence

The records below are verified, state-documented asbestos removals at this facility. Each entry represents a regulated abatement project where the Missouri Department of Natural Resources (Missouri DNR) was notified under federal NESHAP rules, the work was logged, and the asbestos-containing material was confirmed and removed under regulated conditions. These are not allegations or estimates — they are paper records tying documented asbestos-containing material to this specific site.

The following 150 project notification(s) are on file with the Missouri Department of Natural Resources (NESHAP program). These are public regulatory records documenting asbestos abatement, demolition, and renovation work at this facility.

Project IDYearBuilding / SiteOperationACM RemovedContractor
3505-9 St. Louis Avenue (to be demo-collapsing)225sf frbl pipe insulation, 75sf frbl tank insulationMAB Environmental
4024-26 Page Abatement200sf frbl duct wrap, 120sf non-frbl transiteMAB Environmental
1324-26 Union (to be demo-collapsing)110lf frbl pipe insulationMAB Environmental
2924 Barrett Street (Residential)100sf frbl duct wrap,54sf n-f lnlm,238sf n-f flr tile, 70lf frbl duct seam tapeZ & L Wrecking Company
7428 Vermont (house-will demo)50sf frbl duct wrapMAB Environmental
A5428-20112011Boiler Room of Central VPARenovation5000sf frbl thermal system insulation/5000lf pipe insulation/200sf non-frbl f…DJ Contracting Inc.
2008P#0899-9 810 Center St, 201 St. Louis Ave40 lf frbl duct wrap,380 sqft roofng,275sqft VATAsbestos Removal Services, Inc.
2011Cityview Apartments-Basement Boiler Room, Bldg 2030 lf frbl 10" pipe insulationGenCorp Services
2011Lemay Pump Station (M11-186)14 lf frbl pipe insulationCENPRO Services, Inc.
2011John Cochran VAMC Bldg 1 Temporary SPD, Job M11-16710500sf non-frbl floor tile/mstc, 2 lf frbl pipe insulationCENPRO Services, Inc.
5127-20112011B’Nai Brit HlelDEMOLITIONfloor tile/mastic, gasket (Cat II-1400sf)Spirtas Wrecking Company
2011Jesuit Hall54sf frbl duct insulationTalbert Industrial Commercial Services
2012John Cochran Hospital-Bldg #6, Cage Washing Area100 linear feet frbl pipe insulationMidwest Service Group
2012Residence200 lf pipe insulation/100 lf boiler insulationGEI (Global Environmental, Inc.)
2012Northwest Academy of Law24 linear feet frbl pipe insulationBrooks Environmental Service Technicians LLC
2012Sumner High School5000sf non-frbl floor tile/masticMidwest Service Group
2012Nestle Research South Lower Level50sf frbl pipe insulationCENPRO Services, Inc.
2012Trigen100000sf approx. frbl asbestos pipe debrisAdvanced Environmental Services, Inc.
2012Katsinas Construction379sf non-frbl floor tile, 240 lf frbl pipe insulationWellington Environmental
2012Willie Mae Hamilton’s Residence100lf non-frbl ductwork tape located on seamsGEI (Global Environmental, Inc.)
5586-20122012Former Hodgen ElementaryDEMOLITIONneeds insp (removed under prior contract)Ahrens Contracting, Inc.
2012Residence at 2846 Accomac330sf frbl duct wrap insulationMosaic Construction Services, Inc.
2012St. Elizabeth’s Academy50 lf frbl pipe fittingsAdvanced Environmental Services, Inc.
5585-20122012St. Mary & Joseph Parish-former School BuildingDEMOLITIONA5667-2012_Advanced Environmental Services (removed under prior contract)Ahrens Contracting, Inc.
2012St. Louis University Law School125 lf non-frbl ACM pipe fittings, 100 lf non-frbl HVAC vibration clothGenCorp Services
2012Southtown Apartments568 linear feet non-frbl asbestos coated pipeMosaic Construction Services, Inc.
2012Kiener East Parking Garage140-180 lf frbl mudded pipe insulation (fittings)Envirotech, Inc.
2012Elantas PDG-Building 39 Piping (#33659)90 lf frbl pipe insulationWellington Environmental
2012McKinley School90lf frbl pipe insulationAdvanced Environmental Services, Inc.
2012Sumner High School120lf frbl pipe insulationBrooks Environmental Service Technicians LLC
2012Northwest Academy of Law180 lf frbl pipe insulationBrooks Environmental Service Technicians LLC
2012WUSM-Former Sushi Bar75sf frbl boiler insulation, 350 lf non-frbl roof flashingMidwest Service Group
2013A2764-11 3333 LaSalle & 3318 Chouteau (former CATCO Bldg247 lf frbl pipe insulationCardinal Environmental Operations
2013A2862 St. Louis City Hall Lower Level Hallway28 lf frbl pipe insulationCardinal Environmental Operations
2013Laclede I-64/South Taylor Ave @ Chouteau192lf non-frbl asbestos tar coated 24" pipeMosaic Construction Services, Inc.
20134544 Pennsylvania Residence1 cubic yard asbestos pipe insulationMaurice-Benjamin Company
2013St. Louis University High School160lf frbl duct insulation, 70sf frbl floor sheetingGenCorp Services
2013Piccadilly1300sf non-frbl transite siding, 10lf frbl seam tape, 30lf frbl duct wrapGenCorp Services
2013Vacant former office and warehouse renovation3500sf n-f VAT/mastic, 10sf gasket mtrl on ductwindow glazingGlobal Environmental Inc. (was D6114-20130
2013South Kingshighway Project1272sf non-frbl transite panels, 75lf/6lf frbl pipe insul/pipe joint insulationWellington Environmental
2013Commercial Building128sf frbl ceiling tile,27cf frbl boiler debris,8362sf n-f flrtile/mstc,26lf clkAbatepro, Inc.
2013McRee60lf frbl ACM duct wrapGenCorp Services
6259-20132013Jewish College of NursingDEMOLITIONRemoved under previous contract.Ahrens Contracting, Inc.
2013Former Single Family Residence150sf frbl duct insulation, 175lf frbl window caulkingSpirtas Wrecking Company
2013Former Single Family Residence150sf frbl duct insulation, 175lf frbl window caulkingAdvanced Environmental Services, Inc.
20141600 N. Broadway45lf frbl pipe insulationEnvirotech, Inc.
2014Forest Park Gas & Wash Building352sf non-frbl mastic, 15lf frbl pipe wrap, 420lf non-frbl roof flashingAbatepro, Inc.
20142 Residences10lf frbl duct tape, 170lf frbl duct wrapAbatepro, Inc.
2014Vacant Building at 3033 N. Euclid6lf frbl TSI, 2100sf non-frbl floor tileAbatepro, Inc.
2014Former Church110lf frbl pipe insulationAbatepro, Inc.
2014Vacant Building at 1414 N. 13th125sf non-frbl floor tile,125sf non-frbl linoleum, 5lf frbl duct wrapAbatepro, Inc.
2014Park Over The Highway (M14-31)80lf frbl pipe insulationCENPRO Services, Inc.
2014St. Louis Community College Forest Park5sf frbl tank insulation,30lf/26lf frbl pipe insulation/pipe insulation fittingsEnvirotech, Inc.
2014Mann Elementary School150lf frbl asbestos pipe fittingsGeneral Waste Services Inc.
2014City of St. Louis City Hall16lf frbl pipe insulationEnvirotech, Inc.
2014AMEREN70lf frbl pipe insulationCENPRO Services, Inc.
2014Berra Park-Comfort Station15ea frbl mudded jnts,75lf frbl pipe insul,200sf n-f trnst pnls,84lf door caulkMAB Environmental
2014House at 3719 Texas (to be demo-collapsing)35lf frbl pipe insulation, 200sf non-frbl floor sheetingMAB Environmental
6832-20142014Laclede Garage/Warehouse/Training SchoolDEMOLITIONfloor tile/astic, transite, TSI, window caulk (1450 lf, 1036 sf, 5 windows)Spirtas Wrecking Company
20141919 South Grand (Apartment)96sf frbl plaster, 10lf frbl pipe insulationEnvirotech, Inc.
6868-20142014Two story power houseDEMOLITION-Marschel Wrecking
2015Former American Heart Association32sf frbl pipe insul,5200sf nf flr tile/mstc,90lf nf roofing,20lf nf trnst pipeMidwest Service Group
2015Carondelet Park-Comfort Stations Upgrades14ea frbl pipe chase,40sf/30lf frbl pipe ACM debris/insul,72lf door clk,35lf extMAB Environmental
2015Residence936sf non-frbl floor tile/mastic, 1.5sf non-frbl duct seam tapeCrossroads Construction Services, Inc.
2015Empty Lot120sf frbl boiler insulationUniversal Abatement, Inc.
2015House (to be demo)936sf floor tile/mastic, 20lf duct seam tape, caulking on 15 windows/3 doorsAhrens Contracting Inc.
2015Multi-Family Home200lf frbl pipe insulationGenCorp Services
2015Mother of Good Counsel4lf frbl boiler gasketEnvirotech, Inc.
2015Wyman Elementary School (14-0-584)80sf frbl fireproofingMidwest Service Group
2015The Park Frontenac Building30lf frbl TSI, 80sf non-frbl wall pucks, 384lf non-frbl door caulkingEnvirotech, Inc.
2015Hawthorn School for Girls (Job# M15-41)140sf non-frbl ceiling tile masticCENPRO Services, Inc.
2015Rosati Kain High School2960sf nf carpet w/adhesive,1840sf nf flr tile/mstc,112lf nf cove base w/adhsvEnvirotech, Inc.
2015TUMS (Job# M15-42)130sf frbl tank insulationCENPRO Services, Inc.
2015BJC-Mallinckrodt Bldg140lf frbl asbestos containing pipe insulationSpray Services, Inc.
2015BJC-Queeny Tower25lf frbl pipe fittings, 4lf frbl valvesSpray Services, Inc.
20154753-55 Newberry Terrace (house to be demo)25sf frbl duct wrapMAB Environmental
2015Residence (collapsing-will demo)140sf non-frbl duct wrapBrooks Environmental Service Technicians LLC
2015Cathedral Basilica50lf frbl pipe fitting insulationEnvirotech, Inc.
20155602 & 5580 W. Florisssant Avenue (2 residences)30sf frbl duct wrap, 1000sf n-f 9" floor tile masticZ & L Wrecking Company
2015House60sf frbl boiler insul,300lf frbl pipe insul,643sf n-f flr tile on wood(no mstc)GenCorp Services
2015South City Baptist Church180lf frbl pipe insulationWellington Environmental
2015Single Family Residence (will demo)400sf n-f transite-gabled side, 200lf n-f seam tape, 150lf n-f duct wrapZ & L Wrecking Company
2016VA John Cochran Hospital-Chilled Water (15-0-645)175lf frbl pipe/pipe fttng insul,14 mudded pipe fttngs, 12-16 black tar fttngsMidwest Service Group
2016P#1660-1 Missouri School for the Blind10ea asbestos-containing mudded pipe insulation-BathroomsAsbestos Removal Services, Inc.
2016Carnahan Courthouse, Room 21810lf frbl pipe insulationEnvirotech, Inc.
2016Engineers Club of St. Louis8lf non-frbl thermal system insulationCrossroads Construction Services, Inc.
2016Cote Brilliante Presbyterian Chuch (church will be demo)25sf frbl duct wrapBrooks Environmental Service Technicians LLC
2016Residence50sf frbl duct wrapZ & L Wrecking Company
2016Residence (will demo)285sf frbl duct wrap/linoleumZ & L Wrecking Company
2016Residence (will demo)9sf frbl duct wrap & paper materialZ & L Wrecking Company
2016Bishop DuBourg High School3200lf non-frbl window caulkGEI (Global Environmental, Inc.)
2016Missouri Botanical Gardens37512sf nf trnst pnls,6060sf nf wndw clk,870sf nf flrtile/mstc,120lf nf fluepipeCrossroads Construction Services, Inc.
20166230 Waterman Blvd. (Residence)180lf frbl pipe insulationEnvirotech, Inc.
20161430 Olive (Office)80sf frbl pipe insulation, 6800sf non-frbl floor tile/masticEnvirotech, Inc.
2016St. Louis the King School65sf non-frbl floor tile/masticEnvirotech, Inc.
2016Residence (will demo)15sf frbl duct wrap (basement), 1200sf non-frbl transite sidingZ & L Wrecking Company
2016Single Family House (will demo)32lf non-frbl duct wrapNJW Construction Corp.
7969-20162016DEMOLITIONWindow Glazing, Floor Tile, Mastic, Pipe Insulation (WG-30ea., FT-350sf., M-7…Bellon Salvage & Rehabbing
2016United States Post Office20lf frbl pipe insulation-Room 1130Wellington Environmental
2016P#1621-2 St. Louis of France Church Basement Crawl Space10lf frbl duct wrap-basement crawl spaceAsbestos Removal Services, Inc.
2016Forest Park Administration Building100sf frbl tank insulation, 12lf frbl pipe insulation, 50lf frbl pipe fittingsEnvirotech, Inc.
20167600 Hall Street100sf frbl surface insulationEnvirotech, Inc.
2016Residential70sf frbl duct wrapZ & L Wrecking Company
2016Montclair7lf frbl asbestos pipe insulationWellington Environmental
2016Paraquad 5240 Oakland Avenue55lf frbl 3" pipe insul, 22lf frbl 6" pipe insul, 14ea mudded fttng jointsCrossroads Construction Services, Inc.
2017Vacant Commercial Building10sf frbl fire brick doors, 70sf frbl boiler insul, 2070sf n-f floor tile/masticEnvirotech, Inc.
20176900 N. Broadway140lf frbl TSI pipeCrossroads Construction Services, Inc.
2017Wohl Community Center100lf frbl pipe insulation in gymnasiumEnvirotech, Inc.
2017Fairground Swimming Pool Renovation130sf frbl tank insul,6000sf n-f roofng mtrl,32lf n-f door clk,8lf nf trnst pipeGateway Construction Services, Inc.
20171021-29 South Grand Blvd.45sf frbl insul paper,270sf windows-glzng,270sf wndws/3doors-clk,100lf blr clkEnvirotech, Inc.
2017Residence (will demo)10sf frbl duct wrapZ & L Wrecking Company
2017House150lf frbl pipe insulation, 100sf n-f floor tile/masticGateway Construction Services, Inc.
2017Vacant Residence@4915 Geraldine Avenue (will demo)175lf frbl pipe insulationZ & L Wrecking Company
2017New Testament Christian Church130sf n-f floor tile, 4lf frbl thermal systems pipe insulationCrossroads Construction Services, Inc.
2017Killark Electric (17-0-155)160lf frbl TSIMidwest Service Group
2017Vacant Office Space200lf frbl TSI (behind lead contaminated ceramic tile)GEI (Global Environmental, Inc.)
2017Hyde Park-Renovation Recreation building17lf/76lf frbl ext door/wndw clk,100lf frbl fence clk,57lf frbl pipe ins/mudfttgMAB Environmental
2017412 South Sarah Street (17-0-329)80sf frbl tank insulation, 4950sf n-f transite, door caulk (33 windows/9 doors)Midwest Service Group
2017Vacant House at 6452 Nashville85sf frbl duct wrap, 3800sf n-f transite diding, 400lf n-f window caulkingAbatepro, Inc.
2017Pump Room (M17.97)60sf frbl tank insulation,60sf n-f vermiculite,50lf frbl pipe fttg/hangar insulCENPRO Services, Inc.
2017Residence (will demo)2sf frbl duct wrapZ & L Wrecking Company
2017Residence (will demo)2sf frbl duct wrapZ & L Wrecking Company
2017Residence (will demo)340sf frbl duct wrapZ & L Wrecking Company
2017Residence (will demo)8sf frbl duct wrapLittles Wrecking Company II
2017AMEREN General Office Building150lf frbl pipe insulation and pipe fittingsCENPRO Services, Inc.
8817-20172017window caulk (none given)Marschell Wrecking
2017Residence (will demo)40sf non-frbl duct wrap/tapeZ & L Wrecking Company
2018Mendenhall Bldg1900sf n-f floor tile, 145sf n-f pipe wrap, 400lf n-f window caulkHillsdale Demolition Contracting
2018Residence (will demo)180sf frbl duct wrap, 400sf non-frbl floor tielZ & L Wrecking Company
20186682 Oakland Avenue (Vacant Residential)175lf frbl TSIHunt Vac Services
2018South City Catholic Academy (18-0-170)800sf non-frbl floor tile/masticMidwest Service Group
2018Residence@1826 Warren (will demo)15lf frbl pipe insulationZ & L Wrecking Company
2018Elantas PDG-Reactor40sf frbl flue insulation, 85lf frbl TSI fittingsMidwest Service Group
20184027 Winnebago (house to be demo)70lf frbl duct tape, 150lf non-frbl caulkAbatepro, Inc.
2018Single Family Residence2sf frbl duct wrapB & D Wrecking
2018Residence@4933 Geraldine (abate 6/28-29,demo 6/29-7/30)6sf frbl duct wrap, 300lf frbl window caulkZ & L Wrecking Company
2018Berthold Avenue150lf frbl asbestos pipe knucklesGenCorp Services
2018Vacant Residence (abate 10/15, demo 10/15-11/15)125sf frbl duct wrapZ & L Wrecking Company
2018408 North Sarah10sf frbl vbrtn dmpnr,15sf frbl sht flrng,15lf frbl TSI,6624sf/40lf nf ftile/clkHunt Vac Services
2018SLU-ISE Building400lf n-f transite pipe (abandoned water line duct bank)Environmental Operations, Inc.
2019Metropolitan Community Church of Greater St. Louis25lf frbl pipe fittingsEnvironmental Operations, Inc.
2019BMO Harris Bank (section for demolition)67lf frbl pipe insulation, 5000sf non-frbl floor tileWellington Environmental
2019Anhueser Busch-Building 207 (CENPRO Job#: ABP19-4)1675sf floor tile/mastic, 74lf window/door caulk, 60sf duct coatingCENPRO Services, Inc.
2019St. Louis Community College Forest Park (M19-30)4800sf n-f floor tile/mastic, 110lf frbl pipe fitting insulationCENPRO Services, Inc.
2019Vacant Residence (abate 5/29-31, demo 5/29-7/29)15sf frbl duct wrap.Z & L Wrecking Company
20191601 Olive Street8990sf flrtl/mstc,2425sf ylw mstc,400sf blk mstc,1000sf mstc,50lf frbl pipe inslAdvanced Environmental Services, Inc.
2019SLU 3225 Vista20sf frbl duct wrap, window glazing-13 windowsCrossroads Construction Services, Inc.
2019Vacant Residence (abate 7/29, demo 7/29-9/30)2sf frbl duct wrapZ & L Wrecking Company
2019Du Bourg House200lf frbl pipe insulation, 10cf frbl boilerWellington Environmental
20191150 South 3rd Street20sf n-f floor tile, 185lf frbl TSI, 50lf n-f window caulkMidwest Service Group

Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement Program — public regulatory records.

Missouri Boiler and Pressure Vessel Registry — Equipment on File

The following boilers and pressure vessels were registered with the Missouri Department of Labor and Industrial Relations (DOLIR) for this facility. These are public records and have been introduced in asbestos exposure litigation to establish the presence of industrial heating and process equipment — and the contractors and inspectors who serviced it — at this site.

Reg #ManufacturerYr BuiltYr InstalledTypeUseMAWP (PSI)LocationInspectorCert Exp
MO059819Burnham1992FTSTEA15BsmtCarl Davis2001-07-29
MO058308Ao Smith1993WTHWS160BlrmJoe Ammons2001-07-26

Source: Missouri Boiler and Pressure Vessel Registry, DOLIR. Public record. MAWP = maximum allowable working pressure. Types: AUTO=autoclave, STM=steam, HTWR=hot water, UNFD=unfired pressure vessel.

For informational purposes only. Not legal advice. No attorney-client relationship is created by reading this page. © 2026 Rights Watch Media Group LLC — Disclaimer · Privacy · Terms · Copyright

Material Categories in Documented Records

The materials documented above (and similar asbestos-containing materials commonly encountered in records of this type) appear in the AsbestosIndex catalog with historical manufacturer and trust-fund information. Click a category to view manufacturers historically associated with that material:

Critical Filing Deadline & Next Steps

Missouri law gives mesothelioma and asbestos-disease claimants 5 years from the date of medical diagnosis to file a personal-injury lawsuit (Mo. Rev. Stat. § 516.120). For wrongful-death claims after an asbestos-related death, the filing window is 3 years from the date of death (Mo. Rev. Stat. § 537.100). The two deadlines run on separate tracks — preserving one does not extend the other.

The personal-injury clock runs from diagnosis, not from exposure. Mesothelioma latency is typically 20 to 50 years, so workers exposed in the 1950s–1980s are being diagnosed today.

Practical first steps

  1. Document what you remember. Pay stubs, W-2s, union cards, photographs, coworker names, and dates of employment. The WorkChain widget on this page can save a copy you can email yourself.
  2. Preserve medical records. Pathology reports, biopsy results, imaging, and pulmonary-function tests are central to both civil claims and trust-fund filings.
  3. Identify household members. Spouses who laundered work clothing and children of plant workers are eligible for secondary-exposure claims when diagnosed with an asbestos-related disease.
  4. Speak with an asbestos attorney with Missouri experience. The first conversation is free and confidential. Asbestos trust-fund claims and civil claims run on different tracks — both can be pursued in parallel.

Asbestos-Related Diseases

Asbestos fiber exposure can cause several specific diseases that typically appear decades after the original exposure. The latency period — the gap between exposure and diagnosis — usually runs 20 to 50 years. That's why workers exposed in the 1960s, 1970s, and 1980s are receiving diagnoses today.

Mesothelioma

A rare, aggressive cancer that affects the lining of the lungs (pleural mesothelioma), abdomen (peritoneal), or heart (pericardial). Mesothelioma is almost exclusively caused by asbestos exposure, which is why a mesothelioma diagnosis often points directly to historical workplace exposure. Average latency from first exposure to diagnosis is 30-50 years.

Asbestosis

A chronic, non-cancerous scarring of lung tissue caused by inhaled asbestos fibers. Asbestosis causes progressive shortness of breath, persistent cough, and reduced lung function. It does not improve with treatment, and it is a recognized basis for compensation under most trust schedules and civil claims.

Lung Cancer

Asbestos exposure significantly increases the risk of lung cancer, particularly when combined with a history of smoking. Asbestos-related lung cancer is compensable under the same trust schedules and civil claim avenues as mesothelioma.

Other Recognized Diseases

Pleural plaques, pleural thickening, laryngeal cancer, ovarian cancer, and certain gastrointestinal cancers are also recognized as asbestos-related under various trust schedules and case-law authorities, though eligibility and proof requirements vary by claim type.

If you have any of these diagnoses and you worked at this facility, lived with someone who did, or were exposed in any documented capacity, you may have a claim worth pursuing. Speak with an attorney before assuming you don't qualify.

Data Sources

Information about facility equipment, industrial materials, and occupational records referenced on this page is drawn from publicly available sources where applicable, including:

If specific equipment or product claims in this article are sourced from a non-public database, the source is identified parenthetically within the text above.