General Equipment at Columbia Missouri Public Schools Columbia Missouri

The equipment below represents the systems and infrastructure documented or typically present at this facility during the era when asbestos-containing materials were specified in industrial construction. This is general facility-equipment reference — not a legal attribution of any specific product, manufacturer, or exposure event to this facility. Material-category and manufacturer information is addressed in the AsbestosIndex Product Crosswalk linked under the records table below.

Documented Asbestos Evidence

The records below are verified, state-documented asbestos removals at this facility. Each entry represents a regulated abatement project where the Missouri Department of Natural Resources (Missouri DNR) was notified under federal NESHAP rules, the work was logged, and the asbestos-containing material was confirmed and removed under regulated conditions. These are not allegations or estimates — they are paper records tying documented asbestos-containing material to this specific site.

The following 585 project notification(s) are on file with the Missouri Department of Natural Resources (NESHAP program). These are public regulatory records documenting asbestos abatement, demolition, and renovation work at this facility.

Project IDYearBuilding / SiteOperationACM RemovedContractor
125-20012001Burnt Out Classrooms at Oakland J. High SchoolDemolitionColumbia Public Schools
1010P#0103-14 UM-Columbia, Parker Hall, CP10120115 lf pipe insul/110sf tanks insul/1067sf VAT&mstcAsbestos Removal Services, Inc.
617-971997UM-Columbia Connaway Hall Bldg 37017Renovation670 sq. ft. ceiling tile 8(A), 4561 ln. ft. pipe insulation 8(D)&(I)B&R Insulation Inc.
1028-971997912 Range LineDemolition300 sq. ft. linoleum 8(A),ADD 600 SQ. FT. LINOLEUM 8(A)Wellington Environmental Consulting & Construction Inc.
920-971997UM-Columbia Nursing School P#732Renovation120 sq. ft. transite panels 8(C&D)Asbestos Removal Services, Inc.
1740-981998Delmar Cobble SchoolRenovation2,877 sq. ft. floor tile & mastic 8(A)Wellington Environmental Consulting & Construction Inc.
1962-981998Rock Bridge High School Project # 883RenovationNON-NESHAP 60 ln. ft. pipe fittings 8(I)Asbestos Removal Services, Inc.
2296-991999P#977 Two Mile Praire SchoolRenovation160 sq. ft. VAT and mastic adhesive.Asbestos Removal Services, Inc.
2953-20012001P#158 Oakland Junior High SchoolRenovation7,300 sq. ft. VAT & mastic.Asbestos Removal Services, Inc.
2954-20012001P#158 Field Elementary SchoolRenovation2,430 sq. ft. VAT & mastic.Asbestos Removal Services, Inc.
2955-20012001P#158 Grant Elementary SchoolRenovation2,430 sq. ft. VAT & masticAsbestos Removal Services, Inc.
2956-20012001P#158 Robert E Lee Elementary SchoolRenovation4,140 sq. ft. VAT & mastic.Asbestos Removal Services, Inc.
2957-20012001P#158 W Blvd Elementary SchoolRenovation400 sq. ft. VAT & mastic.Asbestos Removal Services, Inc.
2958-20012001P#158 Hickman High SchoolRenovation22,500 sq. ft. VAT & mastic.Asbestos Removal Services, Inc.
125-20012001Burnt Out Classrooms at Oakland J. High SchoolDEMOLITIONColumbia Public Schools
3197-20022002Rockbridge High SchoolRenovation500 ln. ft. TSI, 200 sq. ft. breechingAsbestos Removal Services, Inc.
339-20032003Single Car GarageDEMOLITIONnGlidewell Construction
3358-20032003Hickman High SchoolRenovation7000 sf mastic & tileAsbestos Removal Services, Inc.
3692-20042004W Boulevard ElementaryDemolition1600 sf vat & mastic, may be friableAsbestos Removal Services, Inc.
3691-20042004Rock Bridge ElementaryDemolition2700 sf vat & mastic, may be friableAsbestos Removal Services, Inc.
3690-20042004Grant ElementaryDemolition1000 sf vat & mastic - may be friableAsbestos Removal Services, Inc.
3780-20042004Jesse 130Demolition1600 sf vatUM-Columbia
3902-20052005Medical School, NW-413Demolition420 sf friable floor tile and masticUM-Columbia
3913-20052005UM-Columbia Medical Science Bldg 709Demolition1700 sf floor tileUM-Columbia
3917-20052005Columbia CollegeDemolition3000 sf tile and mastic, 2000 lf TSIAsbestos Removal Services, Inc.
3914-20052005UM-Columbia Stafford AtticDemolition600 sf TSIUM-Columbia
3961-20052005UM-Columbia Med School M516Demolition400 sf friable floor tilUM-Columbia
3972-20052005Hickman High SchoolDemolition200 sf boiler insulationAsbestos Removal Services, Inc.
3992-20052005UM-ColumbiaDemolition2875 lf TSIAsbestos Removal Services, Inc.
4173-20062006Douglas High SchoolRenovationFloor tile and MasticAsbestos Removal Services, Inc.
4174-20062006Hickman High SchoolRenovationFloor tile and MasticAsbestos Removal Services, Inc.
4206-20062006Russell Blvd Elementary SchoolRenovationTSI and debrisAsbestos Removal Services, Inc.
4224-20062006UM-Columbia Sinclair School of NursingRenovationSpray on ceilingGreat Plains Asbestos Control Inc.
2007CP078337 UM-Columbia, Noyes 303, 305, and Hallway36 LF TSIUniversity of Missouri Columbia
2007CP089338 UM-Columbia, Cramer Attic250lf TSIUniversity of Missouri-Columbia
2007CP078354 UM-Columbia, McReynolds subbasement22 LF TSIUniversity of Missouri Columbia
2007CP078292 UM-Columbia, Curtis 10212 LF TSIUniversity of Missouri Columbia
2007P#0737-2 Columbia College40 LF TSI, 800Sqft Floor tile, 20 Sqft linoleumAsbestos Removal Services, Inc.
2007CP068482 UM-Columbia, Clark 23 B20 LF TSIUniversity of Missouri Columbia
2007CP078380 UM-Columbia, Animal Science Research Ctr Rk 12015 LF TSIUniversity of Missouri Columbia
2007CP078393 UM-Columbia, Med Science40 LF TSIUniversity of Missouri Columbia
2007CP078406 UM-Columbia, Wolpers Hall Rm 20430 LF TSIUniversity of Missouri Columbia
2007CP078379 UM-Columbia, Telecom Center20 LF TSIUniversity of Missouri Columbia
2007CP078459 UM-Columbia, Bingham Dining Hall8 LF TSIUniversity of Missouri Columbia
2007CP078247 UM-Columbia, SMH 12535 LF TSIUniversity of Missouri Columbia
2007CP078481 UM-Columbia, SMH-51140 LF TSIUniversity of Missouri Columbia
2007CP078264 UM-Columbia, Tate I Mechanical2 Sqft TSI, 30 LF TSIUniversity of Missouri Columbia
2007CP078489 UM-Columbia, Energy Management34 LF TSI, 121 Sqft Floor tile/masticUniversity of Missouri Columbia
2007CP078495 UM-Columbia, Wolpers Hall25 LF TSIUniversity of Missouri Columbia
2007CP078508 UM-Columbia, Power Plant Boiler 1010 LF TSIUniversity of Missouri Columbia
2007P#078513 UM-Columbia, Waters 1B5 LF TSIUniversity of Missouri Columbia
2007CP078351 UM-Columbia, Med Science Bldg M111A15 LF TSIUniversity of Missouri Columbia
2007P#0735 3M150 LF TSIAsbestos Removal Services, Inc.
2007P#0706 Power Plant20 LF TSIAsbestos Removal Services, Inc.
2007CP078501 UM-Columbia, Energy Management23 LF TSIUniversity of Missouri Columbia
2007CP078546 UM-Columbia, Gwynn Bsmt Hallway15 LF TSIUniversity of Missouri Columbia
2007CP078560 UM-Columbia, Ellis Library5 LF TSIUniversity of Missouri Columbia
2007CP068439 UM-Columbia, Steam Man Hole 4193 Sqft Gasket, 50 LF TSIUniversity of Missouri Columbia
2007CP078563 UM-Columbia, Murr Reactor Building4 LF TSIUniversity of Missouri Columbia
2007CP078538 UM-Columbia, Academic Support Center15 LF TSIUniversity of Missouri Columbia
4453-20072007Grant Elementary SchoolRenovationWindow CaulkAsbestos Removal Services, Inc.
4454-20072007Lee Elementary SchoolRenovationWindow caulk and GlazeAsbestos Removal Services, Inc.
2007CP078581 UM-Columbia, Steam man hole 11825 LF TSIUniversity of Missouri Columbia
2007CP078509 UM-Columbia, Cramer Hall-attic20 LF TSIUniversity of Missouri Columbia
2007CP078594 UM-Columbia, LaFerre Hall100 LF TSIUniversity of Missouri Columbia
2007CP978592 UM-Columbia, Stafford Hall, Room 212 lf TSIUniversity of Missouri-Columbia
2007P#0703 UM-Columbia, Tucker Hall20 LF Duct pipe, 40 Sqft Fume hoodAsbestos Removal Services, Inc.
2007P#0722 West Junior High School30 LF TSIAsbestos Removal Services, Inc.
2007UM-Columbia, Schweitzer Hall32 LF tar covered pipeCorvera Abatement Technologies, Inc.
2007CP078604 UM-Columbia, SMH 00625 LF TSIUniversity of Missouri-Columbia
2007P#0703-6 UM-Columbia300 LF Transite PipeAsbestos Removal Services, Inc.
2007CP089147 UM-Columbia, Chemistry Room 1620 LF TSIUniversity of Missouri Columbia
2007CP058258 UM-Columbia, SMH 00615 LF TSIUniversity Of Missouri Columbia
2007P#0706 Powerplant11 LF TSI, 2 Sqft Tank TSI, 50 Sqft TSI encapsulatAsbestos Removal Services, Inc.
2007CP089157 UM-Columbia, Student Union10 LF TSIUniversity of Missouri Columbia
2007CP058260 UM-Columbia, SMH 00815 LF TSIUniversity of Missouri Columbia
2007CP068407 UM-Columbia, Geological Sciences Building10 LF TSIUniversity of Missouri Columbia
2007CP089162 UM-Columbia, Agriculture Lab10 LF TSIUniversity of Missouri Columbia
2007CP068444 UM-Columbia, SMH 04125 LF TSIUniversity of Missouri Columbia
2007CP089149 UM-Columbia, Geological Sciences15 LF TSIUniversity of Missouri Columbia
2007CP089172 UM-Columbia, SMH 12310 LF TSIUniversity of Missouri Columbia
2007CP089168 UM-Columbia, SMH 12118 LF TSIUniversity of Missouri Columbia
2007CP089192 UM-Columbia, SMH04040 LF TSIUniversity of Missouri Columbia
2007CP089210 UM-Columbia,6 LF TSIUniversity of Missouri Columbia
2007CP078283 UM-Columbia, Lab Animal Corridor6 LF TSIUniversity of Missouri Columbia
2007CP089229 UM-Columbia, Med Science M1558 LF TSIUniversity of Missouri Columbia
2007P# 0799-35 Spencer Street2200 Sqft Siding, 30 LF Transite pipeAsbestos Removal Services, Inc.
2007CP089249 UM-Columbia, McAlester Hall25 LF TSIUniversity of Missouri Columbia
2007CP089258 UM-Columbia, Gwynn Hall, Rm 148lf TSIUniversity of Missouri-Columbia
2007CP089270 UM-Columbia, Parker 14A40 lf TSI;University of Missouri-Columbia
2007CP089277 UM-Columbia, Teaching Hospital GE-08;33 sf TSIUniversity of Missouri-Columbia
2007CP089292 vMedical Science Addition M447A15 lf TSIUniversity of Missouri-Columbia
2007P#089284, UM-Columbia, Schurz Steam Trench, Steam Chase 330150lf TSI, Tar Paper;University of Missouri-Columbia
2007CP089284 vSchurz Steam Trench, Steam Chase 330150lf TSI, tar paperUniversity of Missouri-Columbia
2007CP089301 UM-Columbia, Hallway to 118 LOEB8lf TSI;University of Missouri-Columbia
2007CP089267 UM-Columbia, Arts & Science Bsmnt Mechanical 6A30lf TSI;University of Missouri-Columbia
2007P#089329; UM-Columbia, Parker Hall, Rm 68lf TSI;University of Missouri-Columbia
2007CP089327 UM-Columbia, Lafferre Hall50lf TSI, 71sf TSI;University of Missouri-Columbia
2007UM-Columbia150 lf of ACM piping insulationAsbestos Removal Services, Inc.
2007CP089297 UM-Columbia, Tate 1 Mech50 lf TSIUniversity of Missouri-Columbia
4582-20072007Benton ElementaryRenovationTSI debrisAsbestos Removal Services, Inc.
2008CP078573 UM-Columbia, Physics Roof8lf TSIUniversity of Missouri-Columbia
2008CP089374 UM-Columbia, Middlebush Hall, Room 28lf TSIUniversity of Missouri-Columbia
2008CP089385 UM-Columbia, Medical Science Building M447A12 Lf TSIUniversity of Missouri-Columbia
2008CP089361 UM-Columbia, Fine Arts Building Mechanical Room30 Lf TSIUniversity of Missouri-Columbia
2008CP089384 UM-Columbia, Medical Science Building M00125 Lf TSIUniversity of Missouri-Columbia
2008CP#078446 UM-Columbia, Student Health Center, Room 6E70 LF TSIUniversity of Missouri-Columbia
2008CP078446 UM-Columbia, Student Health Center, Room 6E70 lf TSIUniversity of Missouri-Columbia
2008City of Columbia Power Plant20 LF pipe insulation, 70 sqft tank insulationAsbestos Removal Services, Inc
2008CP089402 UM-Columbia, Hudson Hall, Tunnel7 lf TSIUniversity of Missouri-Columbia
2008CP089425 UM-Columbia, Tate Hall, Room B1150 Lf TSIUniversity of Missouri-Columbia
2008Columbia Plasma Center - Future Home50 Lf Pipe Insulation, 32 sqft Boiler InsulationPerformance Abatement Services, Inc.
2008CP089455 UM-Columbia, Power Plant Boiler 9100 lf TSIUniversity of Missouri-Columbia
2008CP#089445 UM-Columbia, Tate Hall, Room B155 lf TSIUniversity of Missouri-Columbia
4652-20082008Blueridge Elementary (ARSI Job #0822BR)RenovationTransite and Window CaulkingAsbestos Removal Services, Inc.
2008CP0803-3 UM-Columbia, Corner, Jct Fifth St & Conley Aveapprox 80 lf-direct bury steam pipe insulationUniversity of Missouri-Columbia
2008CP089461 UM-Columbia, 417 S 5th, Room C01255 lf of TSIUniversity of Missouri-Columbia
2008CP48711 UM-Columbia, Curtis Hall, Ground Floor, By Elevator8 Lf TSIUniversity of Missouri-Columbia
4653-20082008Fairview Elementary School window replacementRenovationTransite and Window CaulkingAsbestos Removal Services, Inc.
2008CP089492 UM-Columbia, Medical Science Building Room M15 lf of TSIUniversity of Missouri-Columbia
2008P#0806, City of Columbia Power Plant15 lf pipe insltn, 4 valves/flngs,#7 turbine injctAsbestos Removal Services, Inc.
2008CP089495 UM-Columbia, Noyes Hall Room 3136 lf of TSIUniversity of Missouri-Columbia
4684-20082008ARSI#0822-3, Benton Elementary-Classroom 100RenovationSpray Applied CeilingAsbestos Removal Services, Inc.
2008CP089393 UM-Columbia, Ellis Library, Room 4026 lf of TSIUniversity of Missouri-Columbia
2008CP078569 UM-Columbia, Tara Office Basement200 linear feet of friable TSIUniversity of Missouri-Columbia
4674-20082008Parkade ElementaryRenovationtransite panels, asbestos caulking & glazingAsbestos Removal Services, Inc.
2008CP089555 UM-Columbia, Vet Med Outside Steam Chase36 lf TSIUniversity of Missouri-Columbia
2008UM-Columbia, Teaching Hospital GE08, GE-0820 lf TSI, 1 sq ft TSIUniversity of Missouri-Columbia
2008CP089523 UM-Columbia, Read Hall, 1st Floor Hallway36 lf TSIUniversity of Missouri-Columbia
4675-20082008Russell Blvd. Elementary (ARSI Job#0822 R)Renovationtransite panels, asbestos caulking & window glazingAsbestos Removal Services, Inc.
4714-20082008Two Mile Prairie ElementaryRenovationTransite, Caulk and GlazeAsbestos Removal Services, Inc.
2008P#089593, UM-Columbia, Curtis Hall, Room 10335 lf of TSIUniversity of Missouri-Columbia
2008CP089602 UM-Columbia, Noyes Hall, Room 2023 linear feet TSIUniversity of Missouri-Columbia
4715-20082008Midway Heights Elementary (ARSI Job#0822-2)RenovationTransite, Caulk and GlazeAsbestos Removal Services, Inc.
2008CP089635 UM-Columbia, Physics Building, Room 21020 lf TSIUniversity of Missouri-Columbia
2008CP089562 UM-Columbia, McAlester Hall, Room 185 linear feet TSI, 80 sq ft TSIUniversity of Missouri-Columbia
2008P#0822-6 Lee Elementary School2,000sf Vinyl-Asbestos Floor Tile/Asb cntng MasticAsbestos Removal Services, Inc.
2008Rock Bridge Elementary School (ARSI Proj #0822-7)Approx 2,040 sqft Vinyl Asbestos Floor Tile/MasticAsbestos Removal Services, Inc.
2008CP099152 UM-Columbia, Parker Hall, Room 117A5 linear feet of TSIUniversity of Missouri-Columbia
2008P#0870-1 Boone Hospital, 1st Floor Old Pharmacy47 ea. frble Mud Fittings, 8 lf Thermal Pipe InsulAsbestos Removal Services, Inc.
2008CP48825 UM-Columbia, Waters Hall, Room 11730 sq ft TSIUniversity of Missouri-Columbia
2008CP089625 UM-Columbia, Tucker Hall-Basement Mechanical Room18 linear feet of TSIUniversity of Missouri-Columbia
2008CP099181 UM-Columbia, Fine Arts-Music/Drama, Music Auditorium15 lf of TSIUniversity of Missouri-Columbia
4761-20082008Hickman High School Locker RoomRenovationTSI, WindowAsbestos Removal Services, Inc.
2008CP089617 UM-Columbia, Dalton Cardiovascular Research Mchncl Rm50 linear feet of TSIUniversity of Missouri-Columbia
2008CP2606075 UM-Columbia, Jesse Hall, Rooms 409C-F40 linear feet of TSIUniversity of Missouri-Columbia
2008CP099168 UM-Columbia, Clark Hall, Room 1 Heat Exchanger #250 linear feet of TSIUniversity of Missouri-Columbia
2008CP099169 UM-Columbia, Clark Hall, Room 1 Heat Exchanger #350 linear feet of TSIUniversity of Missouri-Columbia
2008CP099164 UM-Columbia, Neff Hall 1959 Addition, Room 64A10 linear feet of TSIUniversity of Missouri-Columbia
2008CP099165 UM-Columbia, Neff Hall 1959 Addition, Room 6415 linear feet of TSIUniversity of Missouri-Columbia
2008CP099225 UM-Columbia, Power Plant Boiler 950 linear feet of TSIUniversity of Missouri-Columbia
2008Small Storage Shed (ARSI P#0837-2)40sqft 4" Joint Tape HVAC Ducts, 25sqft Roll RfngAsbestos Removal Services, Inc.
2008CP089394 UM-Columbia, Fine Arts Building (Art), Room A2240 linear feet of TSIUniversity of Missouri-Columbia
2008P#0803-7 UM-Columbia, 1 Hospital DriveApprox 40 LF Steam Pipe Thermal Systems InsulationAsbestos Removal Services, Inc.
2008CP099279 UM-Columbia, MURR-Reactor Building, Room 1016 linear feet of TSIUniversity of Missouri-Columbia
2008Single family dwelling, ARSI Project #0808-4256sf Sheet Flrng/1lf Watrhtr Exhst Duct WrapAsbestos Removal Services, Inc.
2008CP099217 UM-Columbia, Switzler Hall, Room 222A3 Linear Feet of TSIUniversity of Missouri-Columbia
2008CP099269 UM-Columbia, Clark Hall Mechanical Room15 Linear Feet Friable TSI, GasketsUniversity of Missouri-Columbia
2008CP099257 UM-Columbia, Lafferre Hall, 1st Floor Hall by C12248 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2008CP099266 UM-Columbia, Teaching Hospital, Rm 2E-2540 lf frbl TSI & 90 sqft frbl Surfacing MaterialUniversity of Missouri-Columbia
2008CP099299 UM-Columbia, Gentry Hall, Room 220 linear feet of TSIUniversity of Missouri-Columbia
2008P#0856, Basement, 12 S. 9th StreetGlovebag approx. 120 l.f. friable Pipe InsulationAsbestos Removal Services, Inc.
2008CP099294 UM-Columbia, Manor House, ADA Basement Restroom30 linear feet of friable TSIUniversity of Missouri-Columbia
2008P#0899-26 Single Family Residencel100lf frb DctwrkInsul/200sf TransitePnls/600sf VATAsbestos Removal Services, Inc.
2008ARSI P#0870-4, Boone Hospital Center Rms 1232/123350lf Pipe Fittings/96sf Sheet Flrng/580sf VAT&MstcAsbestos Removal Services, Inc.
2008CP6E-08-1009 UM-Columbia, Teaching Hospital Rm 6E-086 Linear Feet friable TSIUniversity of Missouri-Columbia
2008CP099337 UM-Columbia, Gwynn Hall, Room 820 linear feet of friable TSIUniversity of Missouri-Columbia
2008CP099349 UM-Columbia, Hospital Room 1W2024 linear feet of friable TSIUniversity of Missouri-Columbia
2008CP099354 UM-Columbia, Gentry Hall, Room 205A45 linear feet of friable TSIUniversity of Missouri-Columbia
2008P#0858 Nora Stewart Nursery School400sqft Cat 1 Vinyl Asb Flr Tile & Mastic AdhesiveAsbestos Removal Services, Inc.
2008CP099361 UM-Columbia, Tate Hall, 1st Floor Hallway Stairs4 linear feet of friable TSIUniversity of Missouri-Columbia
2009CP099362 UM-Columbia, Ellis Library-Rm 3D614 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099368 UM-Columbia, Medical Science Bldg Rms M415,MK417,M41840 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2009CP099381 UM-Columbia, Steam Chase 118, VA Parking Lot60 linear feet TSI, 120 sqft Chase LidsUniversity of Missouri-Columbia
2009CP099388 UM-Columbia, Medical Science Building M28310 lf frble TSI (removing for water leak repair)University of Missouri-Columbia
2009CP099392 UM-Columbia, Medical Science Building M57710 linear feet of friable TSIUniversity of Missouri-Columbia
2009CP099345 UM-Columbia, Curtis Hall, 1st Floor Men’s RR60 linear feet of Friable TSIUniversity of Missouri-Columbia
20093 Single Family Homes120lf frbl Duct Tape, 2416sf Sdng, addtnl non-frblAsbestos Removal Services, Inc.
2009CP099405 UM-Columbia, Chemistry Building, Room B130 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099200 UM-Columbia, Curtis Hall-Remove Piping Insul., 310A8 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099391 UM-Columbia, Greenhouse 112 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099409 UM-Columbia, Waters Hall, Room 1C4 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099412 UM-Columbia, Waters Hall, Room 63 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099442 UM-Columbia, Mumford Hall, Mumford Tunnel35 linear feet of Friable TSIUniversity of Missouri-Columbia
A4889-20092009ARSI#0922-1, Jefferson Junior High School, Rm 213Renovationplaster ceilingAsbestos Removal Services, Inc.
2009CP099413 UM-Columbia, Waters Hall, Room 209A4 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099276 UM-Columbia, Stewart Hall, Room 10215 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099446 UM-Columbia, Lafferre Hall Grnd Floor E Mechanical Rm5 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099275 UM-Columbia, Stewart Hall Hallway by Room 1004 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099439 UM-Columbia, Stewart Hall, Room 10A4 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP099431 UM-Columbia,Old Student Health Center 1st Floor Hall4 linear feet of Friable TSIUniversity of Missouri-Columbia
2009CP48750 UM-Columbia,Chemistry Room 16120 linear feet of Friable TSIUniversity of Missouri-Columbia
2009P#0906 Columbia Power Plant near Boiler #7 Hopper20 lf frbl Asbestos Pipe Insulation near Boiler #7Asbestos Removal Services, Inc.
2009CP099296 UM-Columbia, Teaching Hospital Room 8N-0180 linear feet of Friable TSIUniversity of Missouri-Columbia
A4902-20092009UM-ColumbiaSinclair School of NursingRenovationceiling coatingB&R Insulation Inc.
2009Truman VA Hospital, Rms 307 & 30830 ea frbl Pipe Fittings/400sf Floor Tile & MasticAsbestos Removal Services, Inc.
2009CP099507 UM-Columbia, Fine Arts-Music/Drama, Mechanical Rm 39 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2009Blueridge Elementary School, Room 102980 sqft Cat. 1 Floor Tile and Mastic AdhesivesAsbestos Removal Services, Inc.
2009P#099514, UM-Columbia, Jesse Hall-Mechanical Room4 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2009CP099508 UM-Columbia, 1 University Heights, Apt. 1J Bathroom6 Linear Feet Frbl TSI/25 sqft Non-frbl Floor TileUniversity of Missouri-Columbia
2009CP099504 UM-Columbia, Hospital-GE-0823 linear feet Frbl TSI/300 sqft Non-frbl TransiteUniversity of Missouri-Columbia
2009P#0915 3M27lf frbl Interior Pipe Ins/150lf Ext Pipe InsuAsbestos Removal Services, Inc.
2009CP058171 UM-Columbia, Steam Manhole 40630 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2009P#099453, UM-Columbia, General Services Building, Room 3435 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2009CP099373 UM-Columbia, 417 S 5th-A Team Break Room3 Linear Feet Non-friable TSIUniversity of Missouri-Columbia
2009P#099486 UM-Columbia, Rollins Dining Hall C131-Loading Dock Hal20 Linear Feet of Friable TSIUniversity of Missouri-Columbia
2009CP109162 UM-Columbia, Greenhouse 20, Water Heater #118 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109155 UM-Columbia, Dalton Cardiovascular Research, Room 14222 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP099436 UM-Columbia, Gwynn Hall, Room 2150 Linear Feet Non-friable TSIUniversity of Missouri-Columbia
2009P#109132 UM-Columbia, Ellis Library, Room 501 AH#3060 linear feet of Friable TSIUniversity of Missouri-Columbia
2009P#109187 UM-Columbia, Neff Annex Basement Mechanical Room35 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109191 UM-Columbia, 417 S. 5th, Room 1523 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109183 UM-Columbia, McAlester Hall 1stFlr Hlwy Rm 16,25,26&274 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009Former Sacred Heart Rectory Building240 lf Friable Inactive Pipe InsulationAsbestos Removal Services, Inc.
2009CP099306 UM-Columbia,Chemistry 614 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109221 UM-Columbia,Medical Science Bldg NW 31215 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109223 UM-Columbia,Tate Hall Basement Mech Room130 sqft Friable TSI (Duct Jacketing)University of Missouri-Columbia
2009CP0078256 UM-Columbia,University Hall, Rooms 334 & 24143 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109213 UM-Columbia,Old Student Health Center 1st Flr Hallway4 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009CP109138 Dalton Cardiovascular Rsrch Cntr Rm 1394 Linear Feet Friable TSIUniversity of Missouri-Columbia
2009P#0906 Columbia Power Plant-Boiler #7 & #880 lf + 110 lf frbl Asbestos Pipe InsulationAsbestos Removal Services, Inc.
A5029-20092009Former Hoods Bldg (Job #0922-4)Renovation884 sqft frbl sheet vinyl on concreteAsbestos Removal Services, Inc.
2010CP109359 UM-Columbia, University Heights, Rest Room #1L15 Linear Feet Frbl TSIUniversity of Missouri-Columbia
2010CP109371 UM-Columbia, Jesse Hall, Room 130B100 sf TSI, 30 lf TSIUniversity of Missouri-Columbia
2010P#0137 Vacant Residence1335sf Non-frbl Ext Trnst Sdng/2sf HVAC Duct BootAsbestos Removal Services, Inc.
2010CP109273 UM-Columbia, Psychiatric Cntr Rm160,162,136,128,130220 Linear Feet Friable TSIUniversity of Missouri-Columbia
2010CP109385 UM-Columbia, Psychiatry-Custodial Office9 Linear Feet Frbl TSIUniversity of Missouri-Columbia
2010CP109307 UM-Columbia, Middlebush, Room 27 Linear Feet Frbl TSIUniversity of Missouri-Columbia
2010P#0103-3 UM-Columbia, -Parker Hall Rms 1,2,12,12A& 1350lf Thermal Systms Insul/235lf Vinyl Asb FlrTilAsbestos Removal Services, Inc.
2010P#0122 Jefferson Junior High School Steam Tunnel160 lf Friable Thermal Systems Pipe InsulationAsbestos Removal Services, Inc.
2010CP109368 UM-Columbia, Ellis Library, Room B28 Linear Feet Frbl TSIUniversity of Missouri-Columbia
2010P#109412, UM-Columbia, Mcalester Hall, Pump Room35 Linear Feet Frbl TSIUniversity of Missouri-Columbia
2010P#0103 UM-Columbia, University Hospital-Patient Care Tower90 lf frbl Pipe Insul at New Manhole #370Asbestos Removal Services, Inc.
2010P#109407, UM-Columbia, Curtis Hall, Room 1016 Linear Feet Frbl TSIUniversity of Missouri-Columbia
2010UM-Columbia, Ellis Library, Various rooms240 linear feet of TSI/ RopeUniversity of Missouri-Columbia
2010P#0101 Columbia Power Plant50 Linear Feet friable pipe insulationAsbestos Removal Services, Inc.
2010CP10941, UM-Columbia, Hill Hall, Rms 3, 5A, 5B, 5C, 9B, 9C66 lf Non-frbl TSIUniversity of Missouri-Columbia
2010Dalton Cardiovascular Research Cntr-Bsmnt Mech Rm120sf frbl Softener Tank Insul-Basement Mchncl RmAsbestos Removal Services, Inc.
2010P#803-6 CP080401 MU-Columbia, Hitt & Rollins St Steam Tunnel105 lf Pipe Insul/50cu yd Mstc/WaterproofingAsbestos Removal Services, Inc.
2010P#10943, UM-Columbia, Ellis Library, Various Rooms240 Linear Feet Frbl TSI/ROPEUniversity of Missouri-Columbia
2010P#0103-5 Abandoned Steam Tunnel120 lf frbl Pipe Insul/120lf Asphalt WaterproofingAsbestos Removal Services, Inc.
2010Truman VA Hospital-Imaging Center143 sqft Frbl Pipe Fittings (Basement Area)Midwest Service Group
A5161-20102010Parkade Elementary School-Plaster Ceiling RemovalRenovation13,135 sqft frbl plaster ceilingsAsbestos Removal Services, Inc.
2010CP109231 UM-Columbia, Noyes Hall, Rooms 100, 101,103, 10416 linear feet of Frbl TSIUniversity of Missouri-Columbia
2010Boone Hospital Cntr Equipment Rm A Condensate Tank50 sqft frbl Asbestos Tank InsulationAsbestos Removal Services, Inc.
2010P#0103-7 UM-Columbia, Ag Bldg replace Steam/Condensate Line200lf frbl Pipe Insulation/100lf Concrete TrenchesAsbestos Removal Services, Inc.
2010P#0131, Stephens College Children’s School, Rm 108790sf Non-frbl Vinyl Asbestos Floor Tile, Rm 108Asbestos Removal Services, Inc.
2010CP109545 UM-Columbia, Pershing Hall, Laundry Room C12377 linear feet frbl TSIUniversity of Missouri-Columbia
2010Hickman High School Fine Arts Bldg Choir Room2150sf non-frbl vinyl composition floor tile/mstcAsbestos Removal Services, Inc.
2010CP109181 UM-Columbia, University Hall, Room 12318 linear feet frbl TSIUniversity of Missouri-Columbia
2010CP119241 UM-Columbia, MUPC 16 MECH30 linear feet frbl TSIUniversity of Missouri-Columbia
2010CP119246 UM-Columbia, Waters Hall, Room 214A15 linear feet frbl TSIUniversity of Missouri-Columbia
2010UM-Columbia, Agriculture Bldg Laboratory Fume Hoods Rms 1&89 hds/370lf Trnst Pipe/50lf Ductwrk/60lf CountrtpsAsbestos Removal Services, Inc.
2010CP119257 UM-Columbia, Hospital GE-3420 linear feet frbl TSIUniversity of Missouri-Columbia
2010P#0103-10 UM-Columbia, Tucker Hall Mech Rms 15 & 22185 lf frbl pipe insul/100 lf trnst exhst pipingAsbestos Removal Services, Inc.
2010P#0122-6 New Haven Elementary School500 lf ext window glzng/100 lf ext window caulkingAsbestos Removal Services, Inc.
2010P#0103-12 UM-Columbia, Curtis Hall Rm117,208,304C,307,314B,Attic25lf pipe insl/50lf TSI/12lf trnst duct/24lf cntrAsbestos Removal Services, Inc.
2010P#119281 UM-Columbia, Manor House, Apt. 6F4 linear feet frbl TSIUniversity of Missouri-Columbia
2010P#0122-7 UM-Columbia,Shepard Elementary School, Rm 1263 ea. frbl mud fittings from 1" waterline-Room 126Asbestos Removal Services, Inc.
2010P#119287 UM-Columbia, Steam Chase in front of Memorial Union50 linear feet frbl TSIUniversity of Missouri-Columbia
2010CP119298 UM-Columbia,Parker Hall, Mechanical Room 96 linear feet frbl TSIUniversity of Missouri-Columbia
2010P#0106 Columbia Power Plant-Boilers #8,#6,#710sf Tank Insul Blr 8/100Lf Pipe Insul Blr 6&7Asbestos Removal Services, Inc.
2010CP119314 Parker Hall, Room 925 linear feet frbl TSIUniversity of Missouri-Columbia
2011P#1109 Boone Hospital Basement Hallway2 lf frbl pipe insul. basement hallway waterlineAsbestos Removal Services, Inc.
A5320-20112011Sinclair School of Nursing BldgRenovation2646sf frbl spray on ceiling texture, 882sf non-frbl floor tile/masticSpray Services Inc.
2011Rock Bridge High School, ARSI P#1122-42 ea. frbl pipe fittingsAsbestos Removal Services, Inc.
2011P#1122-3 Field Elementary School Rm 112 Restrm30sf non-frbl floor tile/mstc room 112 restroomAsbestos Removal Services, Inc.
2011P#1121 Paquin Tower-1st Floor Lobby12 ea. frbl pipe insulation elbowsAsbestos Removal Services, Inc.
2011UM-Columbia, Steam Tunnel Abatement175 linear feet frbl pipe insulationMidwest Service Group
A5386-20112011Hickman High School Industrial Arts Wing (Job #1122-5)Demolition370sf plaster ceiling material, 100sf transite panels, 2420sf vinyl asbestos …Asbestos Removal Services, Inc.
2011P#1103-6 UM-Columbia, Physics Bldg18 lf thermal systems insulationAsbestos Removal Services, Inc.
2011P#1103-13, CP080214 UM-Columbia, Neff Hall Annex120sf/150lf thermal systems insul-hot wtr tank/heat exchngrAsbestos Removal Services, Inc.
2011P#1103-15 CP091331 UM-Columbia,Storm Sewer Construction400 lf Cat. II transite pipe encased in a concrete ductbankAsbestos Removal Services, Inc.
2011P#1103-16 CP111591 UM-Columbia,Veterinary Medicine Bldg Rm W128,W129397sf non-frbl VAT/1lf trnst flue pipe/10ea frbl pipe elbowsAsbestos Removal Services, Inc.
2011P#1122-3 Field Elementary School-Classrooms 113,116,11536 lf non-frbl window caulkingAsbestos Removal Services, Inc.
2011P#1104 201 S College Ave.69sf boiler lining/70 lf pipe insl/28lf paper inslAsbestos Removal Services, Inc.
2011P#1138-3 Mech Rm C-011 Truman VA Hospital2 mud fttngs on 6"pipe/60 sealant 8"pipe/3 vibrtn jnt clothsAsbestos Removal Services, Inc.
2011P#1103-15 CP091331 UM-Columbia, Abandoned Steam Line6 lf thermal systems insulation from abandoned steamlineAsbestos Removal Services, Inc.
2011P#1103-5 CP100111 UM-Columbia, Steam/Condensate Lines50lf frbl pipe insul/100sf lid watrprfng/60lf transite wtrlnAsbestos Removal Services, Inc.
2011P#1103-21 CP102301 UM-Columbia, Hill Hall156lf frbl thermal systems insul/984sf non-frbl VAT-1st flrAsbestos Removal Services, Inc.
2011P#1122-5 Hickman HS Voc-Ed Bldg/Football Grandstands300lf window caulk/20 lf transite flue pipe/20 lf pipe insulAsbestos Removal Services, Inc.
2011UM-Columbia, Sinclair Farms (Bldgs 13661,13664 & 13638,13680)500sf jnt cmpnd,1140sf flrtile/mstc,4 trnst hds,3sf trnst dctwrk,40lf pipe insulMidwest Service Group
2011P#1103-23 UM-Columbia,Bldgs 13617,13618,13663 at Sinclair Farm15850sf non-frbl VAT, 3cf frbl thrml systms insul-Bldg 13617Asbestos Removal Services, Inc.
2011UM-Columbia,Tucker Hall, Room 305850sf non-frbl floor tile/mstc, 8lf frbl pipe insulation, 3lf frbl pipe fittingsSpray Services, Inc.
2012P#1138-7 Truman VA Hospital5ea frbl pipe elbows water lines-2nd floor, 300sf non-frbl VAT/mstcAsbestos Removal Services, Inc.
2012House60sf frbl wall insulation behind stove/650lf frbl insulation on pipesALM Environmental Services & Construction LLC
2012P#1203-3 CP080214 WA/#25 UM-Columbia, Tucker Hall565sf n-frbl VAT-Rms 13&321, 2ea frbl pipe fttngs/1ea Cat II Epoxy sink Rm 321Asbestos Removal Services, Inc.
2012P#1199-28 Boone County Alternative Sentencing20 lf frbl thermal systems insulationAsbestos Removal Services, Inc.
2012P#1299-8 Chi Omegafrbl=50sf sheet flrng,56lf boiler gskt,130lf tape on ducts;N-frb=1345sf/1430lfAsbestos Removal Services, Inc.
2012P#1199-16 Alpha Delta Pi Sorority House100sf frbl ceiling plaster-2nd floor, 250 lf frbl boiler gaskets-basementAsbestos Removal Services, Inc.
2012P#1232 Columbia College, Dorsey Hall200 lf frbl pipe insulationAsbestos Removal Services, Inc.
2012P#1237 Farmhouse Fraternity-Basement & 2nd Floor44lf frbl pipe insulation-abandoned steamlines-basement/2nd floorAsbestos Removal Services, Inc.
2012P#1222-2 Lee Elementary School300 lf non-frbl window caulking/glazing-store fronts/windows, various locationsAsbestos Removal Services, Inc.
2012P#1222-3 Grant Elementary School1000 lf non-frbl window caulking/glazing-store fronts/windows, various locationsAsbestos Removal Services, Inc.
2012P#1222-4 Ridgeway Elementary School8 linear feet frbl pipe insulationAsbestos Removal Services, Inc.
2012UM-Columbia, Ellis Library (Room #112A)65 linear feet frbl TSI insulationMidwest Service Group
2012P#1222-6 Two Mile Prairie Elementary School100sf vinyl asbestos floor tile/masticAsbestos Removal Services, Inc.
2012P#0122-5 New Haven Elementary School, Room 210720sf vinyl asbestos floor tile/mastic, Room 210Asbestos Removal Services, Inc.
2012P#1222-1 Midway Heights Elementary School1000 lf non-frbl window caulking/glazing-store fronts/windows, various locationsAsbestos Removal Services, Inc.
2012P#1222-7 Rock Bridge High School-South Hallapprox 2ea frbl mudded fittings-south hall adjacent to loading dockAsbestos Removal Services, Inc.
2012UM-Columbia, Tucker Hall50lf/15lf frbl TSI/transite exhaust stack, 1410sf non-frbl floor tile/mstcMidwest Service Group
2012P#1259 Century Link116sf frbl thermal systems insulation-emergency generator exhaustAsbestos Removal Services, Inc.
2012Apartment Building200 lf frbl thermal surface insulationThe Gehm Corporation
2012P#1267, Shelter Insurance Companies30 lf of inactive pipe insulation-1st floor west entranceAsbestos Removal Services, Inc.
2012P#1203-12, UM-Columbia, Lefevre Hall-abndnd steam tunnel, Rm 4apprx 14 lf frbl pipe insulation/64sf ACM debris, abandoned steam tunnel, Room 4Asbestos Removal Services, Inc.
2012P#1199-26 Reality House384sf non-frbl sheet vinyl on wood sub-floor/9lf frbl ductwork- kitchenAsbestos Removal Services, Inc.
2012P#1270 Alpha Gamma Sigma Complexapprox. 50 linear feet frbl tape on HVAC ducts-basementAsbestos Removal Services, Inc.
2013P#1322, Rock Bridge High Schoolapprox. 20ea frbl mudded fittings-men’s shower roomAsbestos Removal Services, Inc.
2013P#1206-3 Vacant Residence500sf n-f vinyl asb flr tile-bsmnt,1sf/4sf n-f tar-roof vent pipe/chimney flshngAsbestos Removal Services, Inc.
2013UM-Columbia, Animal Science Research12sf asbestos waterproofing (tar),16lf asbestos pipe insulationAG Environmental, Inc.
2013P#1310, 1310-1, 1310-2 USGS4 lf non-frbl transite pipe-underground waterlineAsbestos Removal Services, Inc.
2013UM-Columbia, Medical Science Cage Wash160sf flr tile/mstc,10sf tar coated countertop,125lf pipe insul,3ea fire doorsAG Environmental, Inc.
2013P#1322-1 Rock Bridge Elementary Schoolapprox 750sf non-frbl vinyl asbestos floor tile/mastic-Room 18Asbestos Removal Services, Inc.
A6047-20132013West Junior High SchoolRenovation320sf frbl boiler & incinerator insulationAsbestos Removal Services, Inc.
2013P#1322-2 Lee Elementary School70ea frbl TSI fittings-basement mechanical rm, N storage office/janitors’ closetAsbestos Removal Services, Inc.
2013P#1322-3 Oakland Junior High School36lf frbl thermal systems insulation-air handler roomAsbestos Removal Services, Inc.
2013P#1322-5 1322-12 Rock Bridge High School16lf frbl pipe insulation on domestic water lines-Wrestling RoomAsbestos Removal Services, Inc.
2013P#1322-9 Jefferson Junior High Schoolapprox. 40sf vinyl asbestos floor tile/mastic-Music RoomAsbestos Removal Services, Inc.
2013P#1322-13 West Boulevard Elementary School100sf non-frbl vinyl asbestos floor tile/mastic-Room 13Asbestos Removal Services, Inc.
2013P#1399-2 Two Vacant Residences20sf frbl duct seam tape,4sf roof flshng,443sf n-f VAT/113sf mstc,50sf shtvnylAsbestos Removal Services, Inc.
2013P#1303-12, UM-Columbia, Manhole #1034lf frbl pipe insulation-Manhole #103-East of Mumford HallAsbestos Removal Services, Inc.
A6099-20132013Jefferson Junior HighRenovation5082sf frbl ceiling texture, 3106sf non-frbl floor tile/masticNew Horizons Enterprises, LLC
2013P#1317-1 & 1317-11 Cedar Hill Elementary School1045sf non-frbl vinyl asbestos floor tile/mstc-Room 103 & Teachers LoungeAsbestos Removal Services, Inc.
2013P#1322-111322-16,1322-20 Hickman High School-Rms 54,1071071sf non-frbl vinyl asbestos floor tile/mastic-Room 54Asbestos Removal Services, Inc.
2013P#1303-13 CP120712 UM-Columbia, Steam Chase SW Corner Turner & 5th30lf frbl pipe insulation-steam chaseAsbestos Removal Services, Inc.
2013P#1322-7 Field Elementary School-110B,112-118,N Strfrnt?lf n-f window caulking/glazing-Rooms 110B,112-118,N. Ext. StorefrontAsbestos Removal Services, Inc.
A6134-20132013Hagan Academy-5 BldgsDemolition970sf frbl duct wrap/boiler insul/ceiling plstr, 2045lf frbl roof flshng,flr …Asbestos Removal Services, Inc.
2013P#1323-4 Kirkman House30lf frbl ductwork paper tapeAsbestos Removal Services, Inc.
6217-20132013Grounds Shop; 1999 Modular Building; Storage ShedDEMOLITION-C.L. Richardson Construction Company
2013P#1303-17 UM-Columbia, Medical Sciences Building130sf frbl thermal systems insulation on air handler ductwork-5th Floor, Rm M576Asbestos Removal Services, Inc.
2013P#1303-19 UM-Columbia, Gentry Hall16lf frbl pipe insulation-1st Floor BathroomAsbestos Removal Services, Inc.
2014P#1436 Stephens College, Hickman Hall5lf frbl pipe insul-Rm 105,50sf n-f vinyl asb floor tile/mstc-2nd Floor BathroomAsbestos Removal Services, Inc.
2014Single Family Home20lf frbl 2" duct joint tape,190sf n-f Cat II sheet flring on plywood sub floorAsbestos Removal Services, Inc.
2014P#1422-1 Columbia Public Schools Transportation Facility600sf n-f vinyl asbsts flr tile/mstc/15lf frbl mudded fittings-various locationsAsbestos Removal Services, Inc.
2014P#1415 Apartment House135lf frbl HVAC duct pipe-Basement Furnace RoomAsbestos Removal Services, Inc.
A6351-20142014Jefferson Middle SchoolRenovation392sf frbl boiler insulationAsbestos Removal Services, Inc.
2014P#1422-9,Rock Bridge High School1lf frbl fittings-Corridor near Rooms 101 & 102Asbestos Removal Services, Inc.
2014P#1422-2 Blue Ridge Elementary School1740sf Cat I non-frbl vinyl asbestos flr tile/mastic-Office AreaAsbestos Removal Services, Inc.
2014P#1422-10 1422-5 Rock Bridge Elementary Schoolapprox 600sf Cat I non-frbl vinyl asbestos floor tile/mastic-Office EntryAsbestos Removal Services, Inc.
2014P#1299-49 Delta Delta Delta Sorority Annex120lf frbl TSI-Bsmnt, 120lf n-f tar on brick exterior,n-f window caulk,exteriorAsbestos Removal Services, Inc.
2014P#1306-1 Columbia Parks/Recreation Dept Maintenance Bldg62sf frbl duct joint tape-Bsmnt,2095sf n-f VAT,195sf n-f mstc-Tire Storage RmAsbestos Removal Services, Inc.
A6423-20142014Rockbridge Elementary SchoolRenovation4000sf frbl plaster, 15190sf non-frbl floor tile/masticMidwest Service Group
2014P#1422 #1422-16 Russell Boulevard Elementary School2000sf vinyl asbestos floor tile/asb containng mastic-CafeteriaAsbestos Removal Services, Inc.
2014P#1422-3 Fairview Elementary School1500sf Cat I non-frbl mastic under non-ACM flooring-Office AreaAsbestos Removal Services, Inc.
2014P#1422-6 P#1422-12,P#1422-20 New Haven Elementary School2000lf n-f window caulking/glazing (1422-6),10ea mudded jnt fttngs (1422-12)Asbestos Removal Services, Inc.
2014P#1422-4 Field Elementary School4200sf n-f VAT/mstc-Rms 102,103,105,106,108,1st/2nd flr closets,crrdrs,landingsAsbestos Removal Services, Inc.
2014P#1422-14 W Blvd Elementary School90sf/10sf frbl boiler insul/gskt-Boiler Rm,10sf frbl refractory mtrls-Blr DoorsAsbestos Removal Services, Inc.
2014P#1422-17 Single Family Residence50sf/60sf frbl HVAC duct joint wrap/riser duct wrap, 226sf frbl sheet flooringAsbestos Removal Services, Inc.
2014P#1422-21, Hickman High School-Rms 106-1111690sf non-frbl vinyl asbestos floor tile/mastic-Rooms 106-111Asbestos Removal Services, Inc.
2014P#1422-22 Jefferson Middle Schoolapprox. 1020sf vinyl asbestos floor tile/mastic-Music RoomAsbestos Removal Services, Inc.
2014P#1461-1 Commercial Property220lf frbl pipe insulation-Bsmnt W. Mchncl Rm,1500sf n-f VAT-N. Bsmnt VaultAsbestos Removal Services, Inc.
2014P#1438-1 Truman VA Hospital4lf frbl TSI-Room B220Asbestos Removal Services, Inc.
2014Student Housing120lf frbl duct wrap, 164sf non-frbl vinyl floor coveringThe Gehm Corporation
2015P#1518 Alpha Gamma Sigmaapprox 20lf frbl air-cell pipe insulation-Southeast BasementAsbestos Removal Services
2015P#1522 Benton Elementary School1850sf n-f VAT/mstc-Rms 99,104,105,106 & 3522sf n-f VAT/mstc-Rms 207-210/hllwysAsbestos Removal Services, Inc.
2015P#1536-1,2,3 Stephens College,Tower Hall/Hugh Stephens125lf frbl thermal systems insulation-Basement thru 5th FloorAsbestos Removal Services, Inc.
2015P#1506-2 Maplewood House (behind Maplewood Barn Theatre10lf frbl thermal systems insulation-1st FloorAsbestos Removal Services, Inc.
2015P#1522-2 Frederick Douglass High School60lf frbl thermal systems insulation near the Media CenterAsbestos Removal Services, Inc.
A6780-20152015UM-Columbia School of Medicine CP140731Renovation1200sf non-frbl tar waterproofing, 400lf frbl pipe insulationAsbestos Removal Services, Inc.
2015P#1522-3 Oakland Middle School4ea frbl asbestos-containing fittings-140 Hallway CeilingAsbestos Removal Services, Inc.
A6903-20152016UM-Columbia Medical Science Bldg 7th Floor NWRenovation110sf frbl ductwrk skin,19252sf nf flrng/mstc/lvlr,80sf nf wndw clk,440lf/140…Crossroads Construction Services, Inc.
2016P#1603-3 1603-10, UM-Columbia, Med Science Bldg150sf n-f mstc/22lf frbl pipe insul-Rm M307Asbestos Removal Services, Inc.
2016P#1622-1&4 Columbia Public Schools, West Middle Schoolfittings discovered on the roof drain-Music Room StorageAsbestos Removal Services, Inc.
2016P#1603-4 UM-Columbia, Jesse Hall 4th Flr1184sf n-f vinyl asbestos floor tile,50lf frbl pipe insulationAsbestos Removal Services, Inc.
2016Abandoned House for Demo70sf frbl duct tape/wrap, 90sf n-f 9x9 floor tile in upstairs bathroomEmery Sapp & Sons Inc.
2016P#1622-5 Columbia Public Schools-Russell Blvd Elementary7ea asbestos-containing fittings on 3/4" domestic water lineAsbestos Removal Services, Inc.
2016P#1503-28 CP140731 UM-Columbia, School of Medicine/PCCC600sf non-frbl transite wall panels-Atrium EntranceAsbestos Removal Services, Inc.
2016P#1599-31 Delta Gamma Sorority House10sf frbl ACM light fixture reflective heat shield insulationAsbestos Removal Services, Inc.
2016UM-Columbia Professional Hall10sf frbl TSI, 194sf non-frbl floor tile/masticMidwest Service Group
A7029-20162016Russell Boulevard Elementary School, Gym & KitchenRenovation3205sf n-f vinyl asbestos floor tile, 3205sf n-f ACM mastic, 2320sf n-f carpetAsbestos Removal Services, Inc.
2016P#1603-6 UM-Columbia, Softball Stadium Complex200sf non-frbl waterproofing, 60lf frbl pipe insulationAsbestos Removal Services, Inc.
2016P#1603-12 UM-Columbia, General Site-Rplc Bingham Store Site Drain12lf frbl thermal systm insul, 12lf steam trench lids w/Cat I asb cntng membraneAsbestos Removal Services, Inc.
A7028-20162016Blue Ridge Elementary School GymRenovation2520sf n-f carpet, 2520sf n-f ACM masticAsbestos Removal Services, Inc.
2016Frederick Douglass High SchoolAsbestos removed under separate contract with owner.Crawford Construction Inc.
2016P#1603-15 UM-Columbia, Women & Children’s Hospital-Mechanical Bldg4lf non-frbl transite pipe sleeve-Mechanical BldgAsbestos Removal Services, Inc.
2016P#1603-18 UM-Columbia, Middlebush Farm House50lf frbl pipe insul, 295sf n-f Cat I VAT, 45sf frbl sheet vinylAsbestos Removal Services, Inc.
A7070-20162016Midway Heights Elementary SchoolRenovation3380sf n-f carpet, 3940sf n-f associated ACM mastic, 560sf n-f vinyl asbestos…Asbestos Removal Services, Inc.
2016P#1622-8 Jefferson Middle School1800sf non-frbl asbestos-containing mastic adhesives-1st Floor OfficesAsbestos Removal Services, Inc.
2016P#1603-22 UM-Columbia, Hospital, Room 2E363lf frbl TSI Chase WallAsbestos Removal Services, Inc.
2016P#1622-10 John Ridgeway Elementary School, Room 5300sf non-frbl VAT/masticAsbestos Removal Services, Inc.
2016P#1622-9 Rockbridge High School, Basement Tunnel AHU-1220 frbl mudded fittingsAsbestos Removal Services, Inc.
2016P#1669 Shelter Mututal Insurance Company, NW Claims Dept10lf frbl thermal systems insulationAsbestos Removal Services, Inc.
2016P#1699-45 Lambda Chi Alpha, Room 7 & NW Roof Addition200sf n-f VAT, 20lf frbl TSI, 200sf n-f roofing, 625sf Cat. I roofingAsbestos Removal Services, Inc.
8109-20162016Rock Bridge Highschool Concession StandDEMOLITIONS & A Equipment & Builders
2017P#1722 Frederick Douglass High School50sf non-frbl VAT & masticAsbestos Removal Services, Inc.
2017P#1603-20 UM-Columbia, Stewart Hall Auditorium Attic100sf frbl asbestos containing debris, 14lf frbl abandoned pipeAsbestos Removal Services, Inc.
8257-20172017Boone County Fire Station 13DEMOLITION-Donaldson Excavating
A7280-20172017CPS-Hickman High School-Trophy Case CeilingRenovation306sf frbl plaster ceiling textureAsbestos Removal Services, Inc.
2017Dobbs Hall20lf TSIAT Abatement Services Inc.
2017P#1706-1 Single Family Residence, Throughout70lf frbl seam tape,15lf nf cmnt flue pipe,300sf nf tile/mstc,1510sf nf ext sdngAsbestos Removal Services, Inc.
2017P#1706-1 Single Family Residence, Various Areas9sf n-f flr tile, 15lf n-f cementous flue pipe, 2ea n-f window glazingAsbestos Removal Services, Inc.
2017UM-Columbia, Med Science (17-0-103)520sf n-f floor tile/mastic, 65lf frbl TSIMidwest Service Group
2017P#1703-2 CP161411 UM-Columbia, Manhole #15830lf TSI in Concrete Steam TrenchAsbestos Removal Services, Inc.
A7327-20172017CPS-New Haven Elementary SchoolRenovation27500sf n-f vinyl asbestos tile, 27500sf n-f masticAsbestos Removal Services, Inc.
2017P#1751 Pi Beta Phi Sorority, Basement Storage Room20lf frbl TSI in Basement Storage RoomAsbestos Removal Services, Inc.
2017P#1722-3 Blue Ridge Elementary School, North Corridor240sf Cat I non-frbl VAT/mastic-North CorridorAsbestos Removal Services, Inc.
2017P#1703-16 UM-Columbia, Basement & 2nd Floor24lf frbl pipe insulationAsbestos Removal Services, Inc.
2017P#1706-3 City of Columbia-Flat Branch Steam Line36lf n-f lids on steam tunnel, 72lf frbl pipe insulation on steam pipeAsbestos Removal Services, Inc.
2017P#1722-6 Two Mile Prairie Elementary, Kitchen242sf non-frbl VAT/mastic-KitchenAsbestos Removal Services, Inc.
2017P#1728 3M-Steamline near Press 224lf asbestos-containing pipe insulation on steamline near Press 22Asbestos Removal Services, Inc.
2017P#1703-17 CP131822 WA#83,UM-Columbia, Physics Bldg Rm 11412lf frbl asbestos-containing thermal insulationAsbestos Removal Services, Inc.
2017P#1799-38 ZN-1315 Rosemary LLC, 3 Dwelling House-Bsmnt105sf frbl duct wrap-BasementAsbestos Removal Services, Inc.
2017P#1703-19 CP131822 UM-Columbia, Medical Science Bldg,Mech Rm M130lf frbl thermal systems insulation-Mechanical Rm M1Asbestos Removal Services, Inc.
2017P#1790 Lakota Coffee, Basement6ea frbl asbestos pipe fittingsAsbestos Removal Services, Inc.
2017Bryant Walkway70ea frbl mudded pipe fttngs, 72518sf n-f flr tile/mstc,348 wndws/70 doors caulkCrossroads Construction Services, Inc.
2017P#1722-8 CPS-West Middle School, Room 113730sf non-frbl VAT/mastic-Room 113Asbestos Removal Services, Inc.
2018P#1822 CPS-West Middle School, Bathroom Chaseapprox. 6 frbl fittings-Bathroom ChaseAsbestos Removal Services, Inc.
2018P#1803-2 UM-Columbia, Room 282 D1 Hearnes Center7lf asbestos-containing pipe insulation, Room 282 D1 Hearnes CenterAsbestos Removal Services, Inc.
2018P#1803-3CP170621 UM-Columbia New School of Music, Fine Arts Annex683sf VAT/mstc,56ea wndw glzng,55ea firedrs,1005sf rfng felt,10sf wtrprf membranAsbestos Removal Services, Inc.
2018P#1822-2 Two Mile Prairie Elementary School-Strg Rm 11080sf n-f VAT/mastic-Storage Room 110Asbestos Removal Services, Inc.
2018P#1823-1 Columbia College, Columbia House-Student Suppor150sf frbl duct wrapAsbestos Removal Services, Inc.
2018P#1823-2 Columbia College, Single Family Residence-Bsmt12lf frbl duct tape residue-BasementAsbestos Removal Services, Inc.
2018P#1822-3 Rock Bridge High School, Room 1172lf frbl pipe insulation-Room 117Asbestos Removal Services, Inc.
2018P#1838 Truman VA Hospital, Dental Clnc 163/16625ea frbl mudded pipe joints on 4 VAV boxes-Rms 163/166Asbestos Removal Services, Inc.
2018P#1806-3 City of Columbia Steam Tunnel-Steam Pipe 8’ un16lf frbl steam pipe 8ft undergroundAsbestos Removal Services, Inc.
2018P#1822-7 Blue Ridge Elementary School, Hallway1 frbl roof drain mud fitting-HallwayAsbestos Removal Services, Inc.
2018P#1823 Single Family Residence, Bsmnt, Hallway, Exterior12lf frbl ductwork, 24sf n-f floor tile, 8sf n-f roof tarAsbestos Removal Services, Inc.
2018P#1822-4 Russell Blvd Elementary School-Abndnd Incnrtr100sf frbl asbestos containing refractory material inside abandoned incineratorAsbestos Removal Services, Inc.
2018P#1822-8 Rock Bridge High School, Gym Stairwell Closets25 mudded fittings-Lower level gym stairwell closetsAsbestos Removal Services, Inc.
2018P#1822-4 Parkade Elementary School-Abandoned Incinerator100sf frbl asbestos containing refractory material inside abandoned incineratorAsbestos Removal Services, Inc.
2018P#1822-5&6 Hickman High School, Kitchen/CASA Bldg1554sf n-f VAT/mstc(1822-5),520sf nf VAT/mstc,2 bnks wndws nf clk/glzng (1822-6)Asbestos Removal Services, Inc.
2018P#1836-1 Stephens College-Firestone Baar Chapel, Bsmnt106lf frbl thermal systems pipe insulation-Firestone Baar Chapel Bsmnt Mchncl RmAsbestos Removal Services, Inc.
2018P#1806 Columbia Power Plant, Basement Boiler #72lf frbl thermal system insulation-Basement Boiler #7Asbestos Removal Services, Inc.
2018P#1822-10 Fairview Elementary School, Mechanical Roomapprx 100sf frbl asb-containing refractory material inside abndnd incineratorAsbestos Removal Services, Inc.
2018P#1823-5 Columbia College, Exterior Yard30lf frbl direct bury steamline TSIAsbestos Removal Services, Inc.
2018P#1822-11 Parkade Elementary School-Janitor Office100sf n-f VAT & mastic-Janitor OfficeAsbestos Removal Services, Inc.
2018P#1838-9 & P#1838-10 Truman VA Hospital, B008 & D10#1838-9/1838-10,210sf/132sf nf crpt,VAT,mstc,10/31-11/2; 1838-11,4lf TSI,12/14;Asbestos Removal Services, Inc.
2018P#1803-20, UM-Columbia, Middlebush Hall-Room 12540sf frbl drywall, 20lf frbl TSIAsbestos Removal Services, Inc.
2019P#1803-4 UM-Columbia, Memorial Student Union, Ground Floor12sf frbl thermal systems insulationAsbestos Removal Services, Inc.
2019P#1903-3 & P#1903-2 CP181441 UM-Columbia, Medical Science Bldg, Mch Rm1903-3,15lf frbl thermal systems insulation-Mechanical Rm-BasementAsbestos Removal Services, Inc.
2019P#1920 Guitar Building, Attic8lf frbl thermal systems insulation-AtticAsbestos Removal Services, Inc.
2019P#1903-4 UM-Columbia, Micro Lab, Fume Hood60sf n-f transite, 2lf frbl TSI debrisAsbestos Removal Services, Inc.
2019P#1914 Kappa Kappa Gamma Bsmnt Storage Rm-Original Hous26lf frbl TSI-Basement Storge Rm, Original HouseAsbestos Removal Services, Inc.
2019P#1922 Rockbridge High School, Gym Water Fountain10ea frbl mudded fittings-Gym Water FountainARSI, Inc.
2019P#1935 CPWSD 1, Woodhaven Well House100lf wndw glzng,40sf pipe wrap,2000sf cmnt roof pnls,40lf wall clk,40lf pipe iARSI, Inc.
2019P#1903-10 UM-Columbia, Ellis Library-Basement Mechanical Room130lf frbl thermal systems insulation-Ellis Library Basement Mechanical RmARSI, Inc.
2019P#1703-9 UM-Columbia,West Wing-2nd Flr Microbiology Rms 2W09D,E&F8lf frbl thermal insulation systemsARSI, Inc.
2019P#1903-13 UM-Columbia, Chemistry Bldg-Ground Flr Rstrm/Mchncl Chs7ea frbl pipe insulation fittings-Ground Floor Restroom & Mechanical ChaseARSI, Inc.
A7881-20192019Oakland Middle SchoolRenovation207sf frbl tank insulationB&R Insulation Inc.
2019P#1922-4 New Haven Elementary, Rooms 301-305, 407, 4035454sf n-f vinyl asbestos floor tile/mastic-Rms 301-305, 407 & 403 Music RmARSI, Inc.
2019P#1922-2 CPS Career Center, Boiler30sf frbl breaching insulationARSI, Inc.
2019P#1922-6 CPS Locust Street Elementary, 2nd Fl1500sf Cat. I non-frbl tile & masticARSI, Inc.
2019P#1903-16 CP181441 WA#14 UM-Columbia, Mumford Hall, grnd flr outside100sf Cat. I non-frbl tile & mastic-Ground floor corridor outside Labs 26 & 28ARSI, Inc.
2019P#1903-19 UM-Columbia, Sinclair Nursing School, Room 32240sf Cat II n-f transite wall panels behind fan coil unitARSI, Inc.
2019P#1922-3 & P#1922-7&8 CPS-West Middle School-Kitchen, Rm 1101600sf n-f VAT & ACM mastic-KitchenARSI, Inc.
2019UM-Columbia, University Hospital12lf frbl TSI, 50lf non-frbl transite flueMidwest Service Group
2019P#1903-21 CP181642 UM-Columbia, Bingham Commons, Baja Grill120lf frbl thermal systems insulationARSI, Inc.
2019P#1903-8 UM-Columbia, Research Commons-Steam & Water60lf frbl thermal systems insulationARSI, Inc.
2019P#1922-5 CPS-Shepard Blvd Elementary School Office1120sf Cat. I non-frbl VAT & mastic-OfficesARSI, Inc.
2019P#1938-10 Truman VA Hospital, Rms C200,401,5206ea frbl TSI on valvesARSI, Inc.
2019P#1999-27 Single Family Residence-Bsmnt&West Back Addtn200sf n-f VAT, 12lf frbl ductworkARSI, Inc.
2019P#1903-26 &P#1903-28 UM-Columbia, Hospital, Rm 2W-20&2W-056lf thermal systems insulationARSI, Inc.
2019P#1903-31 CP181441 UM-Columbia, S. Well, Ext Manhole,W#2410lf n-f transite electrical conduit encased in concrete duct bankARSI, Inc.
A7999-20192019Sinclair School of NursingRenovation54971sf frbl spry on mtrl on concrete ceiling, 728sf frbl dctwrk skin, 3280sf…ARSI, Inc.
2020P#1999-28 113 North 9th Street (1st & 2nd Floors)522sf n-f floor tile, 80lf frbl thermal systems insulationARSI, Inc.
2020P#1903-26 UM-Columbia, Hospital, Rms 2W-16 & 2W-09G53lf frbl TSI-Rm 2W-09G, 73lf frbl TSI-Rm 2W-16ARSI, Inc.
2020P#2022-2 Rockbridge High School, Lower Level Tunnel4ea frbl fittingsARSI, Inc.
2020P#2003-3 CP181441, WA#29 UM-Columbia, Chemistry Building18ea frbl mud fittings on hot water piping in hallway outside of basement labARSI, Inc.
2020P#2022-3 Hickman High School, N Courtyard Tunnel3ea frbl asbestos containing fittingsARSI, Inc.
2020P#2038-1 Truman VA Hospital, Penthouse Mechanical8 ea frbl valve gaskets on 6 in. pipeARSI, Inc.
2020P#2003-6 UM-Columbia, Clark Hall5ea frbl mudded pipe jointsARSI, Inc.
2020P#2003-5 UM-Columbia, Security Office Expansion, Hosp. Rm 1W-425lf frbl pipe insulARSI, Inc.
2020P#2035 Shelter Insurance Corp. Basement Women’s Restroom9 ea. frbl mudded pipe joingsARSI, Inc.
2020P#2003-9 UM-Columbia, Tucker Hall, 1st floor above men’s room22lf frbl TSIARSI, Inc.
2020P#2022-4 Shepard Blvd. Elementary School, 1st Fl. Electrical Rm.2 ea frbl fittingsARSI, Inc.
10469-20202020University of Missouri, Sinclair School of NursingDEMOLITIONduct wrap, spray on texture, caulk, floor tile/mastic, transite panels (728sf…Greg Bair Track how Service, Inc.
2020P#2022-7 Hickman High School, Classroom 1278sf frbl ceiling txtrARSI, Inc.
2020P#2003-12 UM-Columbia, McKee Gymnasium Rm 1050 lf frbl TSIARSI, Inc.
2020P#2003-7 UM-Columbia, Hospital 2 West30lf frbl pipe insul, HEPA-vacuum pipe chasesARSI, Inc.
2020P#2003-14 UM-Columbia, Clark Hall, Corridor by Rm 840lf frbl pipe insulARSI, Inc.
2020P#2022-9 Columbia Public Schools, Park Ave Bldg, Roof695lf n-f roof flashingARSI, Inc.
2020P#2003-15 UM-Columbia, Noyes Hall, Rm 1196lf frbl pipeARSI, Inc.
2020P#2038-7 Truman VA Hospital, 3rd Floor10ea frbl mudded pipe fittings, 144sf frbl duct insul, 572sf n-f VAT & masticARSI, Inc.
2020P#2003-16 UM-Columbia,Tucker Hall, Rm 710lf frbl TSIARSI, Inc.
2020P#2003-17 UM-Columbia, Jesse Auditorium Mech Rm31lf frbl pipe insul on main water lineARSI, Inc.
2020P#2065 Residential Structure90sf frbl ductwrapARSI, Inc.
2021P#2038-7 Truman VA Hospital, 3rd floor30 ea frbl mudded pipe fittingsARSI, Inc.
2021P#2122 Shepard Blvd Elementary Kitchen10 ea frbl mudded pipe fittingsARSI, Inc.
2021P#2103 UM-Columbia, Vet Diagnostic Lab, Basement Mech Rm100lf frbl TSIARSI, Inc.
2021P#2122-1 Columbia Public Schools, Field Elementary, 1st Floor Girls Restroom20 lf frbl TSIARSI, Inc.
2021P#2103-7 CP202451 UM-Columbia, Jesse Hall165lf frbl pipe insul, plus any ACM debrisARSI, Inc.
2021P#2103-9 CP200471 UM-Columbia, Fine Arts Bldg 2, Mech Rm AHU12lf frbl pipe insul, 1170sf n-f ACM tar on duct insul, 400sf n-f ACM tar on …ARSI, Inc.
2021P#2103-7 UM-Columbia, Jesse Hall, AHU refurbish65sf frbl pipe insulARSI, Inc.
2021P#2103-13 CP200501 UM-Columbia, Sinclair School of Nursing, Buried Ricwell Steam Lin5 LF frbl inactive Ricwell Steam LineARSI, Inc.
2021P#2103-5 UM-Columbia, General Services Bldg, Mech Rm 342 ea frbl fittings, 2 lf frbl TSIARSI, Inc.
2021P#2103-8 UM-Columbia,Tucker Hall, 3rd Floor Hallway15lf frbl pipe insulARSI, Inc.
2021P#2122-3 W Blvd Elementary Kitchen1600sf n-f VAT &masticARSI, Inc.
2021P#2022 Russel Blvd Elementary School, throughout24800sf n-f VAT &masticARSI, Inc.
2021P#2122-3 Ridgeway Elementary Kitchen20sf n-f VAT &masticARSI, Inc.
2021P#2122-2 Rockbridge High School, Basement Hall75ea frbl fittingsARSI, Inc.
2021P#2122-4 Two Mile Prairie Elementary School1200sf n-f VAT &masticARSI, Inc.
2021P#2199-21 Residential Structure120lf frbl duct paper, 180sf n-f sheet flooring on woodARSI, Inc.
2021UM-Columbia, Clark Hall35sf frbl duct insul, 6075sf n-f ACM mastic under carpet and non-ZCM tileSpray Services, Inc.
2021P#2122-3b New Haven Elementary Art Room 11025sf n-f mastic on wallsARSI, Inc.
2021P#2122-2a W Blvd Elementary Enryway1200sf n-f VAT &masticARSI, Inc.
A8267-20212021Jefferson Middle SchoolDemolition2200sf frbl surfacing material, 220 lf frbl TSIB&R Insulation, Inc.
2021P#2103-20 CP181441 UM-Columbia, Medical Science Bldg, M1 Basement Mech Rm40lf frbl pipe insulARSI, Inc.
2021P#2103-27 CP210501 UM-Columiba Hospital, 3rd Fl Pediatric Ctr5ea n-f induction units with ACMARSI, Inc.
2021P#2103-28, CP211381 UM-Columbia Hospital Rm 2E0720lf frbl TSIARSI, Inc.
2021P#2103-30 CP181441 WA52 UM-Columbia, Ellis Library Rm B165lf frbl TSIARSI, Inc.
2021P#2103-35 CP181441 WA#54 UM-Columbia, Jesse Hall Curtis Hall61lf frbl pipe insulARSI, Inc.
2021P#2103-36 UM-Columbia Research Reactor Rm 231 & 231A, CP2101513ea frbl mudded pipe jointsARSI, Inc.
2021P#2103-40, UM-Columbia Medical Science Bldg, Basement Mechanical Rm M1, CP181441 WA#5580lf frbl TSIARSI, Inc.
2021P#2167 Eastwood Motel1430sf n-f VAT, 290sf N-f mastic, 810sf n-f sheet vinyl, 147sf n-f transite w…ARSI, Inc.
2021P#2103-42 UM-Columbia Schweizer Hall, Lab 213 CP21126164sf n-f VAT &mastic, 3sf n-f caulk on HVAC ductARSI, Inc.
2021P#2171 Former Children’s School of Stephen’s College 1st Floor560sf n-f VATARSI, Inc.
2021P#2103-45 UM-Columbia Mumford Hall, Room 2154lf frbl TSIARSI, Inc.
2021P#2103-46 UM-Columbia Hospital, Room GE-0850lf frbl steam pipi insul, 50sr n-f transiteARSI, Inc.
2021P#2199-37 Arrowhead Motel, office building, motel & 4-plex building90sf n-f roof flashing, 26lf n-f window caulk, 20sf frbl ceiling texture, 10s…ARSI, Inc.
2021P#2103-47 UM-Columbia Football Practice Facility, Park Lot SG7C/C manhole to manhole30sf m-f transite duct bankARSI, Inc.
2022P#2203-4 CP212371 UM-Columbia Mumfort Hall Suite 316408sf n-f VAT &mastic, 70lf frbl TSIARSI, Inc.
2022P#2203 CP211291 UM-Columbia Hospital, CT replacement60lf frbl pipe &fitting insulARSI, Inc.
2022P#2203-16 UM-Columbia Medical Science Bldg Room 517 CP181441 WA631lf frbl TSIARSI, Inc.
2022P#2203-17 UM-Columbia General Services Bldg, Outside Trench15lf frbl 16inch steam pipeARSI, Inc.
2022P#2222 Hickman High School AHUs 13 14 15 16 & Rm 24280sf frbl mudded fittingsARSI, Inc.
2022P#2222-1 Shepard Boulevard Elementary240lf frbl mudded fittingsARSI, Inc.
2022P#2203-20 CP221911 UM-Columbia Hospital Room GE08 PRV Replacement100lf frbl TSI, 175sf n-f transite ceiling panelsARSI, Inc.
2022P#2203-18 UM-Columbia Veterinary Medicine West, Rm W127 & W137 Fume Hoods24lf n-f transite exhaust duct, 2ea n-f ACM fume hoodsARSI, Inc.
2022P#2228-1 3-M Solutions, Mechanical Room 15660sf frbl insul on hot water expansion tanksARSI, Inc.
2022P#2222-2 Columbia Public Schools, Russell Blvd Elementary Rm 53 & end of hall18ea frbl fittingsARSI, Inc.
2022P#2203-25 P#2203-28 CP201541 UM-Columiba Medical Science Bldg Rm M437 & M328950sf n-f VAT &mastic, 10lf frbl TSIARSI, Inc.
2022P#2203-27 UM-Columbia Arts & Science Building Mech Room 6A10 ea frbl pipe jointsARSI, Inc.
2022P#2252 Residential Structure80lf frbl TSI wrap &ductworkARSI, Inc.
2022P#2203-22 CP181441 UM-Columbia Memorial Student Union24lf frbl TSIARSI, Inc.
2022P#2203-36 UM-Columbia Hospital Room GE-082lf frbl TSIARSI, Inc.
2022P#2290-30 KMIZ Broadcasting, bathroom & closet30sf frbl mudded pipe joints from water linesARSI, Inc.
2022P#2203-12 UM-Columbia 2 West - Dialysis Unit30lf frbl pipeARSI, Inc.
2022P#2203-41 UM-Columbia Hill Hall Room 16-C14lf frbl TSIARSI, Inc.
2022P#2203-44 CP181441 UM-Columbia Strickland Hall6lf frbl TSIARSI, Inc.
2022P32203-42 CP181441 UM-Columbia Mumford Hall Room 322D4lf frbl TSIARSI, Inc.
2022P#2203-47 UM-Columbia Teaching Hospital Room 2E09A Janitor’s Closet12lf frbl TSIARSI, Inc.
2022P#2203-49 UM-Columbia General Services Bldg Basement2200sf n-f VAT &mastic, 15ea frbl mudded pipe fittingsARSI, Inc.
2023P#2303 UM-Columbia Crowder Hall-Classroom 11230lf frbl TSIARSI, Inc.
2023P#2303-1 UM-Columbia NAKA Hall-Steam Chase6lf frbl TSIARSI, Inc.
2023P#2303-6 UM-Columbia Geological Sciences Bldg Room 55lf frbl TSI in water linesARSI, Inc.
2023P#2303-10 CP181441 UM-Columbia Whitten Hall Room 7 Mechanical Room3sf frbl tank insulARSI, Inc.
2023UM-Columbia Hill Hall60lf frbl pipe insulRichards Remediation Inc.
2023UM-Columbia lagboratory Animal Clinic25 lf frbl TSI pipe fittings, 75sf frbl tank insul, 15sf frbl window caulk, 4…Midwest Service Group
2023P#2303-19 UM-Columbia General Services Bldg 1st Floor NE Corner60lf frbl TSIARSI, Inc.
2023P#2303-15 UM-Columbia University Hall 3rd floor225sf n-f corkboard adhesives, 50lf frbl TSIARSI, Inc.
2023P#2303-16A UM-Columbia Pershing Commons basement & 1st floor45lf frbl TSI on roof drains, 155lf frbl TSI on waterlines, 50sf n-f VAT &masticARSI, Inc.
2023P#2303-17 UM-Columbia Rollins Steamline24lf frbl pipe insulARSI, Inc.
2023P#2354 Beta Sigma Psi Fraternity, Dining Room 107 & Office Room 11330lf frbl TSIARSI, Inc.
2023P#2303-34 UM-Missouri, Hearnes Multipurpose Bldg Hot Herater rm 11512lf frbl TSIARSI, Inc.
2023P#2322-4 Russell Blvd Elementary Rm 101, 141 & 15230sf n-f VAT &mastic, 20ea frbl mudded fittingsARSI, Inc.
A8554-20232023Parkade Elementary SchoolRenovation25000sf n-f mastic adhesivesARSI, Inc.
2023P#2303-38 CP181441 UM-Columbia Life Sciences Steam Chase10lf frbl TSIARSI, Inc.
2023P#2303-17 CP230181 UM-Columbia steamlin24lf frbl pipe insulARSI, Inc.
2023P#2303-42 UM-Columbia Mason Eye Institute Rm EC14325sf frbl TSIARSI, Inc.
2023P#2303-44 CP181441 UM-Columbia Stanley Hall Rm 326lf frbl pipe insulARSI, Inc.
2023P#2322-9 Midway Heights Elementary, Kitchen Restroom30sf n-f VAT &masticARSI, Inc.
2023P#2322-4 Russell Blvd Elementary, downstairs near elevator & closet next to art room25sf n-f VAT &masticARSI, Inc.
2023P#2203-32 UM-Columbia Vet Diagnostics Lab24lf frbl pipe insulARSI, Inc.
A8620-20232023Hickman High School Media CtrDemolition3500sf n-f VAT &masticARSI, Inc.
2023UM-Columbia Clark Hall Mechcanical Rm 1200sf frbl TSI fittingsMidwest Service Group
2023P#2303-60 CP181441 UM-Columbia, General Services Bldg Steam Chase10lf frbl TSI on steam pipeARSI, Inc.
A8631-20232023UM-Columbia Clark HallRenovation300sf frbl duct insul, 80lf frbl TSIARSI, Inc.
2023P#2306-5 Columbia Power Plant Turbine 8100lf frbl TSIARSI, Inc.
A8718-20242024P#2022-3 Benton Elementary SchoolRenovation1300sf n-f VAT &masticARSI, Inc.
2024UM-Columbia, duct bank under S 6th St150lf frbl pipe insul,150sf n-f waterproofingSpectrum Environmental LLC (Alloy Group)
2024University of Missouri-Columbia GW03 Breakroom105sf frbl TSI, 3ea fire doorsAmerican Asbestos Abatement LLC
2024P#2403-62 UM-Columbia Hill Hall Rm 256lf frbl TSI on water linesARSI, Inc.
2025UM-Columbia AHU’s CP2115213lf frbl TSIAmerican Asbestos Abatement LLC dba Midwest Servic
2025Columbia Public School Roseta Learning Ctr4690sf floor tile & mastic, 2000 lf cove base adhesiveSpectrum Environmental LLC (Alloy Group)
A8906-20252025Columbia Public Schools, West Middle SchoolRenovation15800sf n-f VAT &masticARSI, Inc.
2025P#242841 UM-Columbia Naka Hall, 1st Floor Corridor & Roof Drain, P#2503-19, P#2503-322300sf n-f VAT &mastic, 4lf frbl TSIARSI, Inc.
2025P#2503-24 UM-Columbia Stadium20lf Cat II ACM electrical transite conduit encased in concrete (Ductbank)ARSI, Inc
2025P#2516-26 Bridge L0264R1 over Hinkson Crk23sf Cat II insulated compound under 60 tube rail posts (Eastbound)ARSI, Inc
2025P#2503-24 UM-Columbia Stadium25lf Cat II ACM electrical transite conduit encased in concrete (Ductbank)ARSI, Inc
2025P#2503-36 UM-Columbia Tucker Hall Room 204Repair and encapsulation of transite ductARSI, Inc
2025P#2503-41 UM-Columbia Animal Science Reseach Ctr Mech Room 1194lf frbl TSIARSI, Inc.
2025P#2503-25 UM-Columbia Hospital GL-13 Ehat Exchange 120lf frbl TSI, 15ea frbl fittingsARSI, Inc.
A8974-20252025Columbia College Miller HallRenovation1700lf frbl fittings, 800sf frbl TSI, 1100sf n-f VAT &mastic, 480sf n-f caulkARSI, Inc
2025MUTH Rm 2W39 Respiratory Therapy Office20lf frbl TSI piping, 2750sf n-f tile &masticSpray Services, Inc.
2025P#2503-41 UM-Columbia Animal Science Research Center Mechanical Room 11920lf frbl TSI, 64sf frbl TSIARSI, Inc.
2025P#2503-36 UM-Columbia Naka Hall SE Basement45sf Cat I VAT, 1sf Cat II Caulk on rm 27 elevator door, 100lf friable TSIARSI, Inc.
2025P#2503-47 UM-Columbia Ellis Library Rm 104D CP1814414sf frbl TSI pipeARSI, Inc.
2025P#2503-41A UM-Columbia Animal Science Research Ctr, Mech Rm 119 CP18144130lf frbl pipe, 6ea frbl fittingsARSI, Inc.
2025UM-Columbia Respiratory Therapy Office MUTH Rm 2W39250lf frbl TSI pipingSpray Services, Inc.
2026P#2603-6 UM-Columbia Trowbride Ctr Corridor3sf frbl TSI, 100sf frbl debrisARSI, Inc.
2026P#2603-10 CP181441 WA157 UM-Columbia Arts & Science Bldg Rm 20920lf frbl pipe insulARSI, Inc.
2026UM-Columbia Hospital Rm 2W398lf TSI pipeSpray Services, Inc.
2026P#2603-11 CP181441 UM-Columbia Dalton Cardivascular Research Ctr mechanical room8lf frbl pipe insulARSI, Inc.
2026P#2603-16 UM-Columbia Hospital Psychiatric Ctr Rm P0005A10lf frbl TSIARSI, Inc.
2026P#2603-13 CP181441 UM-Columbia Hospital GE23100sf frbl sheet vinyl, 350sf n-f carpet on ACM mastic, 1300sf n-f VCT & ACM …ARSI, Inc.

Source: Missouri Department of Natural Resources, NESHAP Asbestos Abatement Program — public regulatory records.

Missouri Boiler and Pressure Vessel Registry — Equipment on File

The following boilers and pressure vessels were registered with the Missouri Department of Labor and Industrial Relations (DOLIR) for this facility. These are public records and have been introduced in asbestos exposure litigation to establish the presence of industrial heating and process equipment — and the contractors and inspectors who serviced it — at this site.

Reg #ManufacturerYr BuiltYr InstalledTypeUseMAWP (PSI)LocationInspectorCert Exp
MO053899Brunner1000AIRTSTOR200Mach Rm-1Dennis Olson2003-04-09
MO053899Brunner1000AIRTSTOR200Mach Rm-1Jim Pace2003-04-09
MO010264Amsco1981STERPROC40Central SJim Pace2002-04-26
MO010263Amsco1986STERPROC40Central SJim Pace2002-04-26
MO010263Amsco1986STERPROC40Central SJim Pace2002-04-26
MO040212Amsco1993STERPROC40CentJim Pace2002-04-26
MO019272Amsco1996STERPROC40Cent SupplyJim Pace2002-04-26
MO050315Amsco1997ELBLSTER100Surgery/2Nd FlDennis Olson2002-05-10
MO050315Amsco1997ELBLSTER100Surgery/2Nd FlJim Pace2002-05-10
MO050315Amsco1997ELBLSTER100Surgery/2Nd FlJim Pace2002-05-10
MO050316Amsco1997ELBLSTER100Surgery/2Nd FlDennis Oldon2002-05-10
MO050316Amsco1997ELBLSTER100Surgery/2Nd FlJim Pace2002-05-10

Source: Missouri Boiler and Pressure Vessel Registry, DOLIR. Public record. MAWP = maximum allowable working pressure. Types: AUTO=autoclave, STM=steam, HTWR=hot water, UNFD=unfired pressure vessel.

For informational purposes only. Not legal advice. No attorney-client relationship is created by reading this page. © 2026 Rights Watch Media Group LLC — Disclaimer · Privacy · Terms · Copyright

Material Categories in Documented Records

The materials documented above (and similar asbestos-containing materials commonly encountered in records of this type) appear in the AsbestosIndex catalog with historical manufacturer and trust-fund information. Click a category to view manufacturers historically associated with that material:

Critical Filing Deadline & Next Steps

Missouri law gives mesothelioma and asbestos-disease claimants 5 years from the date of medical diagnosis to file a personal-injury lawsuit (Mo. Rev. Stat. § 516.120). For wrongful-death claims after an asbestos-related death, the filing window is 3 years from the date of death (Mo. Rev. Stat. § 537.100). The two deadlines run on separate tracks — preserving one does not extend the other.

The personal-injury clock runs from diagnosis, not from exposure. Mesothelioma latency is typically 20 to 50 years, so workers exposed in the 1950s–1980s are being diagnosed today.

Practical first steps

  1. Document what you remember. Pay stubs, W-2s, union cards, photographs, coworker names, and dates of employment. The WorkChain widget on this page can save a copy you can email yourself.
  2. Preserve medical records. Pathology reports, biopsy results, imaging, and pulmonary-function tests are central to both civil claims and trust-fund filings.
  3. Identify household members. Spouses who laundered work clothing and children of plant workers are eligible for secondary-exposure claims when diagnosed with an asbestos-related disease.
  4. Speak with an asbestos attorney with Missouri experience. The first conversation is free and confidential. Asbestos trust-fund claims and civil claims run on different tracks — both can be pursued in parallel.

Asbestos-Related Diseases

Asbestos fiber exposure can cause several specific diseases that typically appear decades after the original exposure. The latency period — the gap between exposure and diagnosis — usually runs 20 to 50 years. That's why workers exposed in the 1960s, 1970s, and 1980s are receiving diagnoses today.

Mesothelioma

A rare, aggressive cancer that affects the lining of the lungs (pleural mesothelioma), abdomen (peritoneal), or heart (pericardial). Mesothelioma is almost exclusively caused by asbestos exposure, which is why a mesothelioma diagnosis often points directly to historical workplace exposure. Average latency from first exposure to diagnosis is 30-50 years.

Asbestosis

A chronic, non-cancerous scarring of lung tissue caused by inhaled asbestos fibers. Asbestosis causes progressive shortness of breath, persistent cough, and reduced lung function. It does not improve with treatment, and it is a recognized basis for compensation under most trust schedules and civil claims.

Lung Cancer

Asbestos exposure significantly increases the risk of lung cancer, particularly when combined with a history of smoking. Asbestos-related lung cancer is compensable under the same trust schedules and civil claim avenues as mesothelioma.

Other Recognized Diseases

Pleural plaques, pleural thickening, laryngeal cancer, ovarian cancer, and certain gastrointestinal cancers are also recognized as asbestos-related under various trust schedules and case-law authorities, though eligibility and proof requirements vary by claim type.

If you have any of these diagnoses and you worked at this facility, lived with someone who did, or were exposed in any documented capacity, you may have a claim worth pursuing. Speak with an attorney before assuming you don't qualify.

Data Sources

Information about facility equipment, industrial materials, and occupational records referenced on this page is drawn from publicly available sources where applicable, including:

If specific equipment or product claims in this article are sourced from a non-public database, the source is identified parenthetically within the text above.